YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Energy Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Energy Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Assessing the Financial Feasibility of Utility-Provided Backup Power during Project Site Planning

    Source: Journal of Energy Engineering:;2006:;Volume ( 132 ):;issue: 001
    Author:
    K. R. Grosskopf
    ,
    W. J. Shepherd
    ,
    P. Oppenheim
    DOI: 10.1061/(ASCE)0733-9402(2006)132:1(2)
    Publisher: American Society of Civil Engineers
    Abstract: The events leading to the sudden and catastrophic failure of the North American power grid during August 2003 coupled with a record hurricane season a year later have civil engineers rethinking cost-effective backup power solutions for their clients. Electric deregulation across many areas of the United States has utilities looking for new value-added products and services to protect and acquire market shares. As a result, a new partnership has emerged between site planners and utilities to provide affordable backup power to the customer. Case studies are provided for a
    • Download: (348.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Assessing the Financial Feasibility of Utility-Provided Backup Power during Project Site Planning

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/77272
    Collections
    • Journal of Energy Engineering

    Show full item record

    contributor authorK. R. Grosskopf
    contributor authorW. J. Shepherd
    contributor authorP. Oppenheim
    date accessioned2017-05-08T22:18:52Z
    date available2017-05-08T22:18:52Z
    date copyrightApril 2006
    date issued2006
    identifier other40483410.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/77272
    description abstractThe events leading to the sudden and catastrophic failure of the North American power grid during August 2003 coupled with a record hurricane season a year later have civil engineers rethinking cost-effective backup power solutions for their clients. Electric deregulation across many areas of the United States has utilities looking for new value-added products and services to protect and acquire market shares. As a result, a new partnership has emerged between site planners and utilities to provide affordable backup power to the customer. Case studies are provided for a
    publisherAmerican Society of Civil Engineers
    titleAssessing the Financial Feasibility of Utility-Provided Backup Power during Project Site Planning
    typeJournal Paper
    journal volume132
    journal issue1
    journal titleJournal of Energy Engineering
    identifier doi10.1061/(ASCE)0733-9402(2006)132:1(2)
    treeJournal of Energy Engineering:;2006:;Volume ( 132 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian