YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quantitative Design of Backup Prestressing Tendons for Long-Span Prestressed Concrete Box Girder Bridges

    Source: Journal of Bridge Engineering:;2015:;Volume ( 020 ):;issue: 003
    Author:
    Zuanfeng
    ,
    Pan
    ,
    Fangchen
    ,
    You
    DOI: 10.1061/(ASCE)BE.1943-5592.0000651
    Publisher: American Society of Civil Engineers
    Abstract: Excessive deflections unexpected at the midspan have commonly appeared in long-span prestressed concrete box girder bridges, mainly because of the high degree of uncertainty in concrete creep and shrinkage, prestress loss, and variations in the environment. Arrangement of backup prestressing tendons that will be tensioned based on deflection development during the service years is an effective solution to this problem. First, an uncertainty analysis of the long-term deformation at the midspan of a bridge was performed using the Latin hypercube sampling method, with the consideration of model uncertainty of creep and shrinkage and random properties of influencing factors; consequently, the 95% confidence interval of the deformation at the midspan was determined. Then, a quantitative design of backup tendons was performed on the basis of the difference between the lower limit and mean value of the 95% confidence interval of deformation. Lastly, the efficiencies of different arrangement schemes of backup tendons were compared, and results show that arrangement of combined external tendons along the girder is the most effective measure for control of long-term deflection.
    • Download: (892.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Quantitative Design of Backup Prestressing Tendons for Long-Span Prestressed Concrete Box Girder Bridges

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/76036
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorZuanfeng
    contributor authorPan
    contributor authorFangchen
    contributor authorYou
    date accessioned2017-05-08T22:16:51Z
    date available2017-05-08T22:16:51Z
    date copyrightMarch 2015
    date issued2015
    identifier other40071646.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/76036
    description abstractExcessive deflections unexpected at the midspan have commonly appeared in long-span prestressed concrete box girder bridges, mainly because of the high degree of uncertainty in concrete creep and shrinkage, prestress loss, and variations in the environment. Arrangement of backup prestressing tendons that will be tensioned based on deflection development during the service years is an effective solution to this problem. First, an uncertainty analysis of the long-term deformation at the midspan of a bridge was performed using the Latin hypercube sampling method, with the consideration of model uncertainty of creep and shrinkage and random properties of influencing factors; consequently, the 95% confidence interval of the deformation at the midspan was determined. Then, a quantitative design of backup tendons was performed on the basis of the difference between the lower limit and mean value of the 95% confidence interval of deformation. Lastly, the efficiencies of different arrangement schemes of backup tendons were compared, and results show that arrangement of combined external tendons along the girder is the most effective measure for control of long-term deflection.
    publisherAmerican Society of Civil Engineers
    titleQuantitative Design of Backup Prestressing Tendons for Long-Span Prestressed Concrete Box Girder Bridges
    typeJournal Paper
    journal volume20
    journal issue3
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0000651
    treeJournal of Bridge Engineering:;2015:;Volume ( 020 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian