Show simple item record

contributor authorMd. Salim
contributor authorLeonhard E. Bernold
date accessioned2017-05-08T22:16:39Z
date available2017-05-08T22:16:39Z
date copyrightDecember 1994
date issued1994
identifier other%28asce%290733-9364%281994%29120%3A4%28720%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/75953
description abstractReinforced‐concrete structures constitute a major portion of today's construction, and placement of reinforcing bars (rebar) is an integral phase of this type of construction. Placement of rebar is an assembly‐type operation with fabricated rebar being placed and tied one by one. Process‐oriented planning for the placement of rebar aims at the creation of a placement plan that can depict the assembly sequences of individual bars, or a set or sets of bars. While complex rebar configurations necessitate that the crew foreman creates in his or her mind or on paper such a detailed plan, this traditional planning effort does not impact the delivery and staging of rebar. This paper presents a concept of rebar delivery and staging based on a placement plan and discusses the implementation of the concept in a six‐story governmental office building project in Chapel Hill, N.C. Field data on crew performance for the placement of rebar was collected utilizing three different measurement techniques: (1) Productivity ratings; (2) five‐minute rating; and (3) continuous time study. The same crew was provided with the rebar delivered and staged two ways: (1) In a traditional manner; and (2) based on the placement sequences. Finally, a comparison of the productivity results was made. It will be demonstrated where process planning was able to significantly reduce nonproductive time.
publisherAmerican Society of Civil Engineers
titleEffects of Design‐Integrated Process Planning on Productivity in Rebar Placement
typeJournal Paper
journal volume120
journal issue4
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1994)120:4(720)
treeJournal of Construction Engineering and Management:;1994:;Volume ( 120 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record