YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Real-Time Anticollision System for Mobile Cranes during Lift Operations

    Source: Journal of Computing in Civil Engineering:;2015:;Volume ( 029 ):;issue: 006
    Author:
    Weijun Ren
    ,
    Zifeng Wu
    DOI: 10.1061/(ASCE)CP.1943-5487.0000438
    Publisher: American Society of Civil Engineers
    Abstract: To reduce the rate of collision accidents between mobile cranes and immobile obstacles in construction sites during lift operations, this paper develops a real-time automated anticollision system that can warn crane operators about potential collisions and automatically implement collision-avoidance strategies. This system does not require additional devices and can be installed in existing crane controllers. Before the lift operation, the location and shape data of all immobile objects in the work area are collected by a boom head and stored in track-sector database of the system based on the position parameters of the boom head. During the operation of the lift, the proposed system calculates a three-dimensional safe zone for the crane, including boom, cable, and lift object based on the object data in real time, and the movement and position of the crane including boom, cable, and lift object are consistently monitored and predicted in real time through weighted linear-regression models. If the predicted position of the crane is reaching the boundary of the precalculated safety operation zone, three different levels of decelerations and an emergency stop will be automatically executed in order, according to the distance between crane and the obstacles, by the lifting controller to prevent the crane from potential collisions with immobile obstacles. A tentative application of this real-time anticollision system at real construction sites has demonstrated its ability to prevent collisions between cranes and immobile obstacles in work zones during lift operations.
    • Download: (5.345Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Real-Time Anticollision System for Mobile Cranes during Lift Operations

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/75896
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorWeijun Ren
    contributor authorZifeng Wu
    date accessioned2017-05-08T22:16:34Z
    date available2017-05-08T22:16:34Z
    date copyrightNovember 2015
    date issued2015
    identifier other40058735.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/75896
    description abstractTo reduce the rate of collision accidents between mobile cranes and immobile obstacles in construction sites during lift operations, this paper develops a real-time automated anticollision system that can warn crane operators about potential collisions and automatically implement collision-avoidance strategies. This system does not require additional devices and can be installed in existing crane controllers. Before the lift operation, the location and shape data of all immobile objects in the work area are collected by a boom head and stored in track-sector database of the system based on the position parameters of the boom head. During the operation of the lift, the proposed system calculates a three-dimensional safe zone for the crane, including boom, cable, and lift object based on the object data in real time, and the movement and position of the crane including boom, cable, and lift object are consistently monitored and predicted in real time through weighted linear-regression models. If the predicted position of the crane is reaching the boundary of the precalculated safety operation zone, three different levels of decelerations and an emergency stop will be automatically executed in order, according to the distance between crane and the obstacles, by the lifting controller to prevent the crane from potential collisions with immobile obstacles. A tentative application of this real-time anticollision system at real construction sites has demonstrated its ability to prevent collisions between cranes and immobile obstacles in work zones during lift operations.
    publisherAmerican Society of Civil Engineers
    titleReal-Time Anticollision System for Mobile Cranes during Lift Operations
    typeJournal Paper
    journal volume29
    journal issue6
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0000438
    treeJournal of Computing in Civil Engineering:;2015:;Volume ( 029 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian