| contributor author | V. C. Pham | |
| contributor author | W. L. Xu | |
| contributor author | F. Alam | |
| contributor author | F. C. Fang | |
| date accessioned | 2017-05-08T22:11:03Z | |
| date available | 2017-05-08T22:11:03Z | |
| date copyright | March 2015 | |
| date issued | 2015 | |
| identifier other | 37480480.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/73023 | |
| description abstract | In this paper, a probabilistic fuzzy logic control is developed for the signalized control of a diamond interchange to improve the traffic flow on the surface streets and highways. The signal phasing, green-time extension, and ramp metering are decided in response to real-time traffic conditions. The probabilistic fuzzy logic for diamond interchange (PFLDI) includes the following three modules: probabilistic fuzzy phase timing that controls the green-time extension process of the current running phase, phase-selection logic that decides the next phase based on the presetup phase logic by the local transport authority, and probabilistic fuzzy ramp metering that determines the on-ramp-metering rate based on the traffic conditions of the arterial streets and highways. The | |
| publisher | American Society of Civil Engineers | |
| title | Probabilistic Fuzzy Logic Signal and Ramp Metering at a Diamond Interchange | |
| type | Journal Paper | |
| journal volume | 141 | |
| journal issue | 3 | |
| journal title | Journal of Transportation Engineering, Part A: Systems | |
| identifier doi | 10.1061/(ASCE)TE.1943-5436.0000735 | |
| tree | Journal of Transportation Engineering, Part A: Systems:;2015:;Volume ( 141 ):;issue: 003 | |
| contenttype | Fulltext | |