YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Alternative Contractual Arrangements for Urban Light Rail Systems: Lessons from Two Case Studies

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 003
    Author:
    Carlos Oliveira Cruz
    ,
    Rui Cunha Marques
    ,
    Inês Pereira
    DOI: 10.1061/(ASCE)CO.1943-7862.0000942
    Publisher: American Society of Civil Engineers
    Abstract: The need to improve urban transportation systems in order to decrease travel time and increase their reliability while keeping the costs at an affordable level has led governments to develop public-private partnership (PPP) arrangements in urban light rail systems. Many cities around the world have used the PPP model for the construction of urban light rail systems, particularly light rail, since it provides a quicker and easier answer to financing these large investments. However, different models have been adopted. In most cases a typical design–build–operate–transfer model, with long duration (e.g., 30 years), is used, but other innovative models have also been adopted (e.g., a hybrid model with different contracts for infrastructure construction and maintenance—a 20-year contract—and another for the systems operation—a 5-year contract). This paper addresses the advantages and disadvantages of these models, using one case study for each model. The conclusions show that the hybrid model has the potential to decrease the operation costs, but at the same time to mitigate the interface risk (operation <-> infrastructure).
    • Download: (270.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Alternative Contractual Arrangements for Urban Light Rail Systems: Lessons from Two Case Studies

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/72142
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorCarlos Oliveira Cruz
    contributor authorRui Cunha Marques
    contributor authorInês Pereira
    date accessioned2017-05-08T22:08:26Z
    date available2017-05-08T22:08:26Z
    date copyrightMarch 2015
    date issued2015
    identifier other32326057.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/72142
    description abstractThe need to improve urban transportation systems in order to decrease travel time and increase their reliability while keeping the costs at an affordable level has led governments to develop public-private partnership (PPP) arrangements in urban light rail systems. Many cities around the world have used the PPP model for the construction of urban light rail systems, particularly light rail, since it provides a quicker and easier answer to financing these large investments. However, different models have been adopted. In most cases a typical design–build–operate–transfer model, with long duration (e.g., 30 years), is used, but other innovative models have also been adopted (e.g., a hybrid model with different contracts for infrastructure construction and maintenance—a 20-year contract—and another for the systems operation—a 5-year contract). This paper addresses the advantages and disadvantages of these models, using one case study for each model. The conclusions show that the hybrid model has the potential to decrease the operation costs, but at the same time to mitigate the interface risk (operation <-> infrastructure).
    publisherAmerican Society of Civil Engineers
    titleAlternative Contractual Arrangements for Urban Light Rail Systems: Lessons from Two Case Studies
    typeJournal Paper
    journal volume141
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000942
    treeJournal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian