YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Event-Based Approach to Optimize the Timing of Water Main Rehabilitation with Asset Management Strategies

    Source: Journal of Water Resources Planning and Management:;2014:;Volume ( 140 ):;issue: 006
    Author:
    E. Roshani
    ,
    Y. R. Filion
    DOI: 10.1061/(ASCE)WR.1943-5452.0000392
    Publisher: American Society of Civil Engineers
    Abstract: Municipalities with limited budgets will have to rehabilitate their stock of deteriorated water mains in the coming decades. Optimization and asset management offer municipalities the opportunity to plan the rehabilitation of their water mains in a more rational manner. The aim of this paper is to develop a new event-based approach to optimize the timing of water main rehabilitation. The approach incorporates a new gene-coding scheme and covers the full range of decisions about pipe replacement, duplication, lining, new pipe installation, and asset management strategies (infrastructure adjacency and quantity discounts applied to the installed pipe). The new approach is applied to the Fairfield water network, and results suggest that applying a budget constraint prohibits early investment in pipe rehabilitation with a resulting increase in leakage, pipe breaks, and energy costs. Applying pipe discounts decreases capital and operation costs and favors pipe lining over pipe replacement and duplication in the Fairfield network. A sensitivity analysis suggests that uncertainties in demand, leakage, and break growth rate have a moderate to significant impact on capital and operation costs.
    • Download: (827.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Event-Based Approach to Optimize the Timing of Water Main Rehabilitation with Asset Management Strategies

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/70252
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorE. Roshani
    contributor authorY. R. Filion
    date accessioned2017-05-08T22:03:54Z
    date available2017-05-08T22:03:54Z
    date copyrightJune 2014
    date issued2014
    identifier other%28asce%29ww%2E1943-5460%2E0000025.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70252
    description abstractMunicipalities with limited budgets will have to rehabilitate their stock of deteriorated water mains in the coming decades. Optimization and asset management offer municipalities the opportunity to plan the rehabilitation of their water mains in a more rational manner. The aim of this paper is to develop a new event-based approach to optimize the timing of water main rehabilitation. The approach incorporates a new gene-coding scheme and covers the full range of decisions about pipe replacement, duplication, lining, new pipe installation, and asset management strategies (infrastructure adjacency and quantity discounts applied to the installed pipe). The new approach is applied to the Fairfield water network, and results suggest that applying a budget constraint prohibits early investment in pipe rehabilitation with a resulting increase in leakage, pipe breaks, and energy costs. Applying pipe discounts decreases capital and operation costs and favors pipe lining over pipe replacement and duplication in the Fairfield network. A sensitivity analysis suggests that uncertainties in demand, leakage, and break growth rate have a moderate to significant impact on capital and operation costs.
    publisherAmerican Society of Civil Engineers
    titleEvent-Based Approach to Optimize the Timing of Water Main Rehabilitation with Asset Management Strategies
    typeJournal Paper
    journal volume140
    journal issue6
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0000392
    treeJournal of Water Resources Planning and Management:;2014:;Volume ( 140 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian