YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Fast Hybrid Optimization Method for Effective Pump Scheduling

    Source: Journal of Water Resources Planning and Management:;2013:;Volume ( 139 ):;issue: 002
    Author:
    Carlo Giacomello
    ,
    Zoran Kapelan
    ,
    Matteo Nicolini
    DOI: 10.1061/(ASCE)WR.1943-5452.0000239
    Publisher: American Society of Civil Engineers
    Abstract: The cost of electricity used for pumping in water-distribution systems typically represents the largest part of the total operational costs. Therefore, optimization of pump operations is a major concern for water utilities around the world, especially in recent years with significantly increasing energy prices. Recently, to maximize cost and energy savings, pump scheduling is frequently done in real time by integrating the relevant optimization software into the water company’s supervisory control and data acquisition (SCADA) system. This, however, requires solving a complex, large, nonlinear optimization problem in a computationally efficient manner, typically in less than 1 h. To achieve this, the pump-scheduling problem is solved in this paper by a novel hybrid optimization method that uses linear programming (LP) and a greedy algorithm: LPG. The new methodology is applied to two case studies: the artificial, benchmark case study of Anytown network and the real-life pump-scheduling problem of the Richmond water-distribution network (WDN) in the UK. The results obtained clearly demonstrate that the LPG hybrid method is capable of solving real-life pump-scheduling problems in an extremely computationally efficient manner while preserving the accuracy (i.e., the near optimality) of the obtained solution. This makes the method particularly appealing for use in real-time pump-scheduling applications.
    • Download: (271.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Fast Hybrid Optimization Method for Effective Pump Scheduling

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/70101
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorCarlo Giacomello
    contributor authorZoran Kapelan
    contributor authorMatteo Nicolini
    date accessioned2017-05-08T22:03:28Z
    date available2017-05-08T22:03:28Z
    date copyrightMarch 2013
    date issued2013
    identifier other%28asce%29wr%2E1943-5452%2E0000284.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70101
    description abstractThe cost of electricity used for pumping in water-distribution systems typically represents the largest part of the total operational costs. Therefore, optimization of pump operations is a major concern for water utilities around the world, especially in recent years with significantly increasing energy prices. Recently, to maximize cost and energy savings, pump scheduling is frequently done in real time by integrating the relevant optimization software into the water company’s supervisory control and data acquisition (SCADA) system. This, however, requires solving a complex, large, nonlinear optimization problem in a computationally efficient manner, typically in less than 1 h. To achieve this, the pump-scheduling problem is solved in this paper by a novel hybrid optimization method that uses linear programming (LP) and a greedy algorithm: LPG. The new methodology is applied to two case studies: the artificial, benchmark case study of Anytown network and the real-life pump-scheduling problem of the Richmond water-distribution network (WDN) in the UK. The results obtained clearly demonstrate that the LPG hybrid method is capable of solving real-life pump-scheduling problems in an extremely computationally efficient manner while preserving the accuracy (i.e., the near optimality) of the obtained solution. This makes the method particularly appealing for use in real-time pump-scheduling applications.
    publisherAmerican Society of Civil Engineers
    titleFast Hybrid Optimization Method for Effective Pump Scheduling
    typeJournal Paper
    journal volume139
    journal issue2
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0000239
    treeJournal of Water Resources Planning and Management:;2013:;Volume ( 139 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian