YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    After-Fracture Reserve Strength of Two Four-Chord Aluminum Sign Trusses

    Source: Journal of Structural Engineering:;2014:;Volume ( 140 ):;issue: 001
    Author:
    Robert J. Connor
    ,
    Steven Altstadt
    DOI: 10.1061/(ASCE)ST.1943-541X.0000802
    Publisher: American Society of Civil Engineers
    Abstract: Many departments of transportation use four-chord aluminum tubular truss structures to support dynamic message signs (DMS). Inspections have often revealed that these structures contain cracks that likely occurred during or shortly after fabrication or were caused by fatigue while in service. Nearly all of these cracks are located at welded tube-to-tube connections, such as the diagonal-to-main chord fillet welded connections. Both weld toe cracks and surface-breaking root cracks have been observed. Destructive testing was conducted to evaluate the after-fracture reserve strength (AFRS) of 21.3-m-span and 16.8-m-span aluminum four-chord trusses. The dead weight of a DMS was simulated by attaching steel beams of the same weight eccentric to one exterior side of the truss near midspan. Wind load was simulated by hydraulic jacks and a whiffle-tree loading configuration. Simple steel frames were fabricated to mimic the sign truss end supports. Realistic boundary conditions, similar to the truss-to-end frame connections were provided by U-bolt connections and saddles found in the field. Fractures in up to two chords at the same cross section were simulated by cutting the members with a reciprocating saw. The testing revealed that both 21.3-m and 16.8-m span trusses have a considerable amount of reserve strength in the severely faulted (i.e., several members severed) condition. Testing of a main chord retrofit was conducted on the 16.8-m truss. Simple frame three-dimensional (3D) finite-element analysis was also conducted, and the predictions compared to the experimental data. Based on the results, recommendations are presented regarding how to respond if cracked members are discovered during inspection. The results are believed to be applicable to other similar trusses with span lengths up to 21.3 m.
    • Download: (43.84Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      After-Fracture Reserve Strength of Two Four-Chord Aluminum Sign Trusses

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/68736
    Collections
    • Journal of Structural Engineering

    Show full item record

    contributor authorRobert J. Connor
    contributor authorSteven Altstadt
    date accessioned2017-05-08T22:00:41Z
    date available2017-05-08T22:00:41Z
    date copyrightJanuary 2014
    date issued2014
    identifier other%28asce%29st%2E1943-541x%2E0000844.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/68736
    description abstractMany departments of transportation use four-chord aluminum tubular truss structures to support dynamic message signs (DMS). Inspections have often revealed that these structures contain cracks that likely occurred during or shortly after fabrication or were caused by fatigue while in service. Nearly all of these cracks are located at welded tube-to-tube connections, such as the diagonal-to-main chord fillet welded connections. Both weld toe cracks and surface-breaking root cracks have been observed. Destructive testing was conducted to evaluate the after-fracture reserve strength (AFRS) of 21.3-m-span and 16.8-m-span aluminum four-chord trusses. The dead weight of a DMS was simulated by attaching steel beams of the same weight eccentric to one exterior side of the truss near midspan. Wind load was simulated by hydraulic jacks and a whiffle-tree loading configuration. Simple steel frames were fabricated to mimic the sign truss end supports. Realistic boundary conditions, similar to the truss-to-end frame connections were provided by U-bolt connections and saddles found in the field. Fractures in up to two chords at the same cross section were simulated by cutting the members with a reciprocating saw. The testing revealed that both 21.3-m and 16.8-m span trusses have a considerable amount of reserve strength in the severely faulted (i.e., several members severed) condition. Testing of a main chord retrofit was conducted on the 16.8-m truss. Simple frame three-dimensional (3D) finite-element analysis was also conducted, and the predictions compared to the experimental data. Based on the results, recommendations are presented regarding how to respond if cracked members are discovered during inspection. The results are believed to be applicable to other similar trusses with span lengths up to 21.3 m.
    publisherAmerican Society of Civil Engineers
    titleAfter-Fracture Reserve Strength of Two Four-Chord Aluminum Sign Trusses
    typeJournal Paper
    journal volume140
    journal issue1
    journal titleJournal of Structural Engineering
    identifier doi10.1061/(ASCE)ST.1943-541X.0000802
    treeJournal of Structural Engineering:;2014:;Volume ( 140 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian