YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Benchmarking Construction Labor Productivity

    Source: Practice Periodical on Structural Design and Construction:;2015:;Volume ( 020 ):;issue: 004
    Author:
    H. Randolph
    ,
    Thomas
    DOI: 10.1061/(ASCE)SC.1943-5576.0000141
    Publisher: American Society of Civil Engineers
    Abstract: There appears to be confusion regarding how to conduct a comprehensive benchmarking study, especially one on labor productivity. This paper details a six-step procedure for conducting a labor productivity benchmarking study. The procedure addresses the questions of how, who, and why. The procedure is illustrated using three case study projects. A labor productivity study has several unique features. First, the objective must be precisely defined. A study of labor productivity can be done for many reasons, and the purpose must be clearly defined because the objective influences subsequent decisions involving protocols. Procedures for how the study will be conducted to assure valid comparisons must be developed. Next, the key performance indicators (KPIs) must be determined and a procedure must be established for evaluating multiple KPIs. Labor productivity is unique in that there is no single KPI that can be used to define best performance. Multiple KPIs are proposed and procedures are developed. Once a procedure is developed for evaluating multiple KPIs, data are collected and the best performer is identified. The last question is, “why is a project/activity/entity the best?” This question is often ignored in most so-called benchmarking studies. Once the best project/activity/entity is identified, principles can be summarized as a prescription for productivity improvement.
    • Download: (859.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Benchmarking Construction Labor Productivity

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/67829
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorH. Randolph
    contributor authorThomas
    date accessioned2017-05-08T21:58:27Z
    date available2017-05-08T21:58:27Z
    date copyrightNovember 2015
    date issued2015
    identifier other%28asce%29sc%2E1943-5576%2E0000189.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/67829
    description abstractThere appears to be confusion regarding how to conduct a comprehensive benchmarking study, especially one on labor productivity. This paper details a six-step procedure for conducting a labor productivity benchmarking study. The procedure addresses the questions of how, who, and why. The procedure is illustrated using three case study projects. A labor productivity study has several unique features. First, the objective must be precisely defined. A study of labor productivity can be done for many reasons, and the purpose must be clearly defined because the objective influences subsequent decisions involving protocols. Procedures for how the study will be conducted to assure valid comparisons must be developed. Next, the key performance indicators (KPIs) must be determined and a procedure must be established for evaluating multiple KPIs. Labor productivity is unique in that there is no single KPI that can be used to define best performance. Multiple KPIs are proposed and procedures are developed. Once a procedure is developed for evaluating multiple KPIs, data are collected and the best performer is identified. The last question is, “why is a project/activity/entity the best?” This question is often ignored in most so-called benchmarking studies. Once the best project/activity/entity is identified, principles can be summarized as a prescription for productivity improvement.
    publisherAmerican Society of Civil Engineers
    titleBenchmarking Construction Labor Productivity
    typeJournal Paper
    journal volume20
    journal issue4
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)SC.1943-5576.0000141
    treePractice Periodical on Structural Design and Construction:;2015:;Volume ( 020 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian