YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Natural Hazards Review
    • View Item
    •   YE&T Library
    • ASCE
    • Natural Hazards Review
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Out of Sync: World Bank Funding for Housing Recovery, Postdisaster Planning, and Participation

    Source: Natural Hazards Review:;2014:;Volume ( 015 ):;issue: 001
    Author:
    N. Emel
    ,
    Ganapati
    ,
    Anuradha
    ,
    Mukherji
    DOI: 10.1061/(ASCE)NH.1527-6996.0000120
    Publisher: American Society of Civil Engineers
    Abstract: The World Bank is increasingly at the forefront of housing reconstruction in countries affected by disasters. Yet, the literature on the World Bank’s postdisaster housing projects is rather thin. This paper examines the postdisaster housing reconstruction processes of two disaster projects financed by the World Bank in India and Turkey following the 2001 Gujarat and 1999 Marmara earthquakes. Based on interviews, focus groups, participant observation, and a review of secondary sources, the authors focus on the Bank-related factors that affected the housing recovery processes and outcomes. While acknowledging the role of the recipient governments of India and Turkey in housing recovery, the authors argue that the housing reconstruction components of both projects reflected a sense of urgency about completion in part because of the Bank’s emergency recovery loan mechanism and measures of project success. In addition, the projects were not flexible enough to allow for addressing the challenges faced during the implementation process—specifically, the challenges of synchronizing housing reconstruction with planning, land readjustment, and participation—in part because of the Bank’s strict institutions and organizational routines and its organizational culture.
    • Download: (2.229Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Out of Sync: World Bank Funding for Housing Recovery, Postdisaster Planning, and Participation

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/67517
    Collections
    • Natural Hazards Review

    Show full item record

    contributor authorN. Emel
    contributor authorGanapati
    contributor authorAnuradha
    contributor authorMukherji
    date accessioned2017-05-08T21:57:45Z
    date available2017-05-08T21:57:45Z
    date copyrightFebruary 2014
    date issued2014
    identifier other%28asce%29nm%2E2153-5477%2E0000055.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/67517
    description abstractThe World Bank is increasingly at the forefront of housing reconstruction in countries affected by disasters. Yet, the literature on the World Bank’s postdisaster housing projects is rather thin. This paper examines the postdisaster housing reconstruction processes of two disaster projects financed by the World Bank in India and Turkey following the 2001 Gujarat and 1999 Marmara earthquakes. Based on interviews, focus groups, participant observation, and a review of secondary sources, the authors focus on the Bank-related factors that affected the housing recovery processes and outcomes. While acknowledging the role of the recipient governments of India and Turkey in housing recovery, the authors argue that the housing reconstruction components of both projects reflected a sense of urgency about completion in part because of the Bank’s emergency recovery loan mechanism and measures of project success. In addition, the projects were not flexible enough to allow for addressing the challenges faced during the implementation process—specifically, the challenges of synchronizing housing reconstruction with planning, land readjustment, and participation—in part because of the Bank’s strict institutions and organizational routines and its organizational culture.
    publisherAmerican Society of Civil Engineers
    titleOut of Sync: World Bank Funding for Housing Recovery, Postdisaster Planning, and Participation
    typeJournal Paper
    journal volume15
    journal issue1
    journal titleNatural Hazards Review
    identifier doi10.1061/(ASCE)NH.1527-6996.0000120
    treeNatural Hazards Review:;2014:;Volume ( 015 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian