YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 003
    Author:
    Mohammed Ruqaishi
    ,
    Hamdi A. Bashir
    DOI: 10.1061/(ASCE)ME.1943-5479.0000248
    Publisher: American Society of Civil Engineers
    Abstract: Several studies investigating the causes of delay in projects in the construction industry have been conducted worldwide. This study investigates the causes of delay in construction projects in oil and gas processing facilities in Oman and serves as a case study for the Gulf Cooperation Council (GCC) countries. Using a questionnaire, data were collected from 59 project managers employed in different organizations in the oil and gas industry in Oman. The survey results showed a high degree of agreement among the perceptions of project stakeholders, clients, contractors, and consultants on the causes of project delay, and there is no evidence to suggest that the causes of project delay differ significantly according to organization size or organizational ownership. Moreover, seven factors were identified as the major causes of project delay. Although six of these identified elements are general factors that can account for delay in any project in any industry, one of them—poor interaction with vendors in the engineering and procurement stages—is found to be unique to construction projects in the oil and gas industry. The findings of this study could be of value to organizations that are planning to conduct construction projects for oil and gas processing facilities in Oman and other nations with similar environments, such as the GCC countries.
    • Download: (694.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/66304
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorMohammed Ruqaishi
    contributor authorHamdi A. Bashir
    date accessioned2017-05-08T21:54:59Z
    date available2017-05-08T21:54:59Z
    date copyrightMay 2015
    date issued2015
    identifier other%28asce%29mt%2E1943-5533%2E0000001.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66304
    description abstractSeveral studies investigating the causes of delay in projects in the construction industry have been conducted worldwide. This study investigates the causes of delay in construction projects in oil and gas processing facilities in Oman and serves as a case study for the Gulf Cooperation Council (GCC) countries. Using a questionnaire, data were collected from 59 project managers employed in different organizations in the oil and gas industry in Oman. The survey results showed a high degree of agreement among the perceptions of project stakeholders, clients, contractors, and consultants on the causes of project delay, and there is no evidence to suggest that the causes of project delay differ significantly according to organization size or organizational ownership. Moreover, seven factors were identified as the major causes of project delay. Although six of these identified elements are general factors that can account for delay in any project in any industry, one of them—poor interaction with vendors in the engineering and procurement stages—is found to be unique to construction projects in the oil and gas industry. The findings of this study could be of value to organizations that are planning to conduct construction projects for oil and gas processing facilities in Oman and other nations with similar environments, such as the GCC countries.
    publisherAmerican Society of Civil Engineers
    titleCauses of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study
    typeJournal Paper
    journal volume31
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000248
    treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian