YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Proposed System for Measuring Project Performance Using Process-Based Key Performance Indicators

    Source: Journal of Management in Engineering:;2012:;Volume ( 028 ):;issue: 002
    Author:
    Tatsiana Haponava
    ,
    Saad Al-Jibouri
    DOI: 10.1061/(ASCE)ME.1943-5479.0000078
    Publisher: American Society of Civil Engineers
    Abstract: Despite some evidence of its usefulness, performance measurement by using Key Performance Indicators (KPIs) in the construction industry also has its critics. Among the shortcomings attributed to existing KPIs is the fact that almost all of them are product oriented. This means that the indicators are mostly used for review purposes after a project is completed and do not provide the opportunity to control the work whilst the project is still in progress. Many researchers have agreed on the need for a new approach that considers the construction process and allows active control. This paper describes the design of a proposed generic system for measuring process performance. As a basis for measuring process performance, the proposed measurement system relies on a series of questions related to both process completeness and process quality. The structure of the measurement system is on the basis of the findings of an earlier stage of the research that had resulted in the development of a number of process-based KPIs and the key issues they encompass. The appropriateness of the proposed measurement system has been tested on two on-going projects. The testing has shown that the proposed system produces relatively accurate indications of actual performance of construction projects. In this research, it was not possible to test the validity or the effectiveness of the proposed measurement system for control in practice. This is because of the long timescales involved in real-life projects and because of the possible influence of control actions taken by project management between the various processes.
    • Download: (460.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Proposed System for Measuring Project Performance Using Process-Based Key Performance Indicators

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/66136
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorTatsiana Haponava
    contributor authorSaad Al-Jibouri
    date accessioned2017-05-08T21:54:33Z
    date available2017-05-08T21:54:33Z
    date copyrightApril 2012
    date issued2012
    identifier other%28asce%29me%2E1943-5479%2E0000109.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66136
    description abstractDespite some evidence of its usefulness, performance measurement by using Key Performance Indicators (KPIs) in the construction industry also has its critics. Among the shortcomings attributed to existing KPIs is the fact that almost all of them are product oriented. This means that the indicators are mostly used for review purposes after a project is completed and do not provide the opportunity to control the work whilst the project is still in progress. Many researchers have agreed on the need for a new approach that considers the construction process and allows active control. This paper describes the design of a proposed generic system for measuring process performance. As a basis for measuring process performance, the proposed measurement system relies on a series of questions related to both process completeness and process quality. The structure of the measurement system is on the basis of the findings of an earlier stage of the research that had resulted in the development of a number of process-based KPIs and the key issues they encompass. The appropriateness of the proposed measurement system has been tested on two on-going projects. The testing has shown that the proposed system produces relatively accurate indications of actual performance of construction projects. In this research, it was not possible to test the validity or the effectiveness of the proposed measurement system for control in practice. This is because of the long timescales involved in real-life projects and because of the possible influence of control actions taken by project management between the various processes.
    publisherAmerican Society of Civil Engineers
    titleProposed System for Measuring Project Performance Using Process-Based Key Performance Indicators
    typeJournal Paper
    journal volume28
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000078
    treeJournal of Management in Engineering:;2012:;Volume ( 028 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian