YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Alternative Project Delivery Methods for Water and Wastewater Projects: Do They Save Time and Money?

    Source: Leadership and Management in Engineering:;2011:;Volume ( 011 ):;issue: 003
    Author:
    Gordon Culp
    DOI: 10.1061/(ASCE)LM.1943-5630.0000133
    Publisher: American Society of Civil Engineers
    Abstract: Are there alternative methods for delivering water and wastewater treatment projects that can save time and money without sacrificing project quality? This is an especially relevant question in these difficult economic times. This paper addresses the question by comparing traditional and alternative project delivery methods in terms of their effects on project quality, schedule, and costs. Project delivery methods discussed are traditional design–bid–build and the alternative methods of design–build, design–build–operate, and design–build–finance–operate.
    • Download: (352.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Alternative Project Delivery Methods for Water and Wastewater Projects: Do They Save Time and Money?

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/65975
    Collections
    • Leadership and Management in Engineering

    Show full item record

    contributor authorGordon Culp
    date accessioned2017-05-08T21:54:17Z
    date available2017-05-08T21:54:17Z
    date copyrightJuly 2011
    date issued2011
    identifier other%28asce%29lm%2E1943-5630%2E0000176.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/65975
    description abstractAre there alternative methods for delivering water and wastewater treatment projects that can save time and money without sacrificing project quality? This is an especially relevant question in these difficult economic times. This paper addresses the question by comparing traditional and alternative project delivery methods in terms of their effects on project quality, schedule, and costs. Project delivery methods discussed are traditional design–bid–build and the alternative methods of design–build, design–build–operate, and design–build–finance–operate.
    publisherAmerican Society of Civil Engineers
    titleAlternative Project Delivery Methods for Water and Wastewater Projects: Do They Save Time and Money?
    typeJournal Paper
    journal volume11
    journal issue3
    journal titleLeadership and Management in Engineering
    identifier doi10.1061/(ASCE)LM.1943-5630.0000133
    treeLeadership and Management in Engineering:;2011:;Volume ( 011 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian