YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Irrigation and Drainage Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Irrigation and Drainage Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Prediction of Rainfall for Short Term Irrigation Planning and Scheduling—Case Study in Victoria, Australia

    Source: Journal of Irrigation and Drainage Engineering:;2011:;Volume ( 137 ):;issue: 007
    Author:
    Aftab H. Azhar
    ,
    B. J. C. Perera
    DOI: 10.1061/(ASCE)IR.1943-4774.0000317
    Publisher: American Society of Civil Engineers
    Abstract: In the short-term planning (7–14 days) and operation of complex irrigation systems, an estimate of irrigation water demand (IWD) is of a fundamental concern. To predict the IWD, a reliable estimate of the expected rainfall during any irrigation period is of fundamental importance. Rainfall is generally predicted with a certain probability of exceedance. However, the standard flood flow-frequency distributions cannot be used for prediction of rainfall of such short durations because these rainfall series in general consist of zero values. Two methods, the total probability theorem (TPT) with three normalizing transformations (i.e., power, log, and square root), and the leaky law (LL) were used to predict the rainfall of short durations (7–14 days, depending upon the number of irrigations per season) in the Goulburn irrigation area (GIA) of Victoria, Australia. Investigations indicated that the TPT using the power transformation (TPTP) was more effective in modeling the short-term data series than the log (TPTL) and square-root transformations (TPTS). Although the overall fitting of the short-term rainfall data series by the LL method was significantly (99%) better than the TPT method, some series could not be fitted by the LL method. This revealed that the LL method could not model all short-term rainfall data series. Results showed that although both the TPT and LL were quite satisfactory in predicting short-term seasonal rainfall of short durations in the study area, none of them was individually able to model all the short-term rainfall series. Hence, the joint use of TPT and LL methods was recommended for short-term rainfall prediction of the study area.
    • Download: (1.432Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Prediction of Rainfall for Short Term Irrigation Planning and Scheduling—Case Study in Victoria, Australia

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/65214
    Collections
    • Journal of Irrigation and Drainage Engineering

    Show full item record

    contributor authorAftab H. Azhar
    contributor authorB. J. C. Perera
    date accessioned2017-05-08T21:52:55Z
    date available2017-05-08T21:52:55Z
    date copyrightJuly 2011
    date issued2011
    identifier other%28asce%29ir%2E1943-4774%2E0000345.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/65214
    description abstractIn the short-term planning (7–14 days) and operation of complex irrigation systems, an estimate of irrigation water demand (IWD) is of a fundamental concern. To predict the IWD, a reliable estimate of the expected rainfall during any irrigation period is of fundamental importance. Rainfall is generally predicted with a certain probability of exceedance. However, the standard flood flow-frequency distributions cannot be used for prediction of rainfall of such short durations because these rainfall series in general consist of zero values. Two methods, the total probability theorem (TPT) with three normalizing transformations (i.e., power, log, and square root), and the leaky law (LL) were used to predict the rainfall of short durations (7–14 days, depending upon the number of irrigations per season) in the Goulburn irrigation area (GIA) of Victoria, Australia. Investigations indicated that the TPT using the power transformation (TPTP) was more effective in modeling the short-term data series than the log (TPTL) and square-root transformations (TPTS). Although the overall fitting of the short-term rainfall data series by the LL method was significantly (99%) better than the TPT method, some series could not be fitted by the LL method. This revealed that the LL method could not model all short-term rainfall data series. Results showed that although both the TPT and LL were quite satisfactory in predicting short-term seasonal rainfall of short durations in the study area, none of them was individually able to model all the short-term rainfall series. Hence, the joint use of TPT and LL methods was recommended for short-term rainfall prediction of the study area.
    publisherAmerican Society of Civil Engineers
    titlePrediction of Rainfall for Short Term Irrigation Planning and Scheduling—Case Study in Victoria, Australia
    typeJournal Paper
    journal volume137
    journal issue7
    journal titleJournal of Irrigation and Drainage Engineering
    identifier doi10.1061/(ASCE)IR.1943-4774.0000317
    treeJournal of Irrigation and Drainage Engineering:;2011:;Volume ( 137 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian