YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Irrigation and Drainage Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Irrigation and Drainage Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Retrofitting Detention Basin with Water Quality Control Pool

    Source: Journal of Irrigation and Drainage Engineering:;2009:;Volume ( 135 ):;issue: 005
    Author:
    James C. Y. Guo
    DOI: 10.1061/(ASCE)IR.1943-4774.0000051
    Publisher: American Society of Civil Engineers
    Abstract: Many detention basins built before 1990 are not equipped with storm-water quality control device. With the latest developments in low impact development for storm-water management, these existing detention basins need modifications on their outlet structures to increase on-site runoff treatment and disposal. An outlet shall be designed to have, at least, three levels of release, including water quality release over 12–48 h, low flow release for 10-year event, and 100-year high flow release. All these efforts are to aim at the full spectrum runoff treatment that is not only to capture the minor and major events but also to store microevents. Over the years, the empirical methods under different assumptions have been developed for determining the design storm-water quality control volume (WQCV). To improve the consistency in storm-water detention designs, this paper presents a mathematical model that produces the synthetic runoff-volume capture curves normalized by the local average rainfall event-depth. A runoff-volume capture curve defines the relationship between WQCV and runoff capture ratio on a long-term basis. A higher runoff capture ratio requires a larger storage volume. Using the runoff capture curve as the basis, the WQCV can be consistently determined for the preselected runoff capture target such as the 80% recommended by the U.S. Environmental Protection Agency in 1986. A case study illustrates how to retrofit an existing outfall concrete vault with a perforated plate and a micropool for WQCV. With a three-level release control, the outfall box can have a slow release for microevents and a fast release for extreme events. This procedure has been recommended for designing a new basin and retrofitting an existing one for the metro Denver area. Details can be found in the UD-DETENTION computer model available at www.udfcd.org at no cost to download.
    • Download: (654.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Retrofitting Detention Basin with Water Quality Control Pool

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/64928
    Collections
    • Journal of Irrigation and Drainage Engineering

    Show full item record

    contributor authorJames C. Y. Guo
    date accessioned2017-05-08T21:52:26Z
    date available2017-05-08T21:52:26Z
    date copyrightOctober 2009
    date issued2009
    identifier other%28asce%29ir%2E1943-4774%2E0000077.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/64928
    description abstractMany detention basins built before 1990 are not equipped with storm-water quality control device. With the latest developments in low impact development for storm-water management, these existing detention basins need modifications on their outlet structures to increase on-site runoff treatment and disposal. An outlet shall be designed to have, at least, three levels of release, including water quality release over 12–48 h, low flow release for 10-year event, and 100-year high flow release. All these efforts are to aim at the full spectrum runoff treatment that is not only to capture the minor and major events but also to store microevents. Over the years, the empirical methods under different assumptions have been developed for determining the design storm-water quality control volume (WQCV). To improve the consistency in storm-water detention designs, this paper presents a mathematical model that produces the synthetic runoff-volume capture curves normalized by the local average rainfall event-depth. A runoff-volume capture curve defines the relationship between WQCV and runoff capture ratio on a long-term basis. A higher runoff capture ratio requires a larger storage volume. Using the runoff capture curve as the basis, the WQCV can be consistently determined for the preselected runoff capture target such as the 80% recommended by the U.S. Environmental Protection Agency in 1986. A case study illustrates how to retrofit an existing outfall concrete vault with a perforated plate and a micropool for WQCV. With a three-level release control, the outfall box can have a slow release for microevents and a fast release for extreme events. This procedure has been recommended for designing a new basin and retrofitting an existing one for the metro Denver area. Details can be found in the UD-DETENTION computer model available at www.udfcd.org at no cost to download.
    publisherAmerican Society of Civil Engineers
    titleRetrofitting Detention Basin with Water Quality Control Pool
    typeJournal Paper
    journal volume135
    journal issue5
    journal titleJournal of Irrigation and Drainage Engineering
    identifier doi10.1061/(ASCE)IR.1943-4774.0000051
    treeJournal of Irrigation and Drainage Engineering:;2009:;Volume ( 135 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian