YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Factors Affecting Construction Project Outcomes: Case Study of Vietnam

    Source: Journal of Professional Issues in Engineering Education and Practice:;2010:;Volume ( 136 ):;issue: 003
    Author:
    Florence Yean Yng Ling
    ,
    Thi Thuy Dung Bui
    DOI: 10.1061/(ASCE)EI.1943-5541.0000013
    Publisher: American Society of Civil Engineers
    Abstract: Due to the demand for built products from foreign investors and the growing economy, Vietnam’s construction industry experiences strong growth. While some of the construction projects are successfully executed, others faced difficulties. The aim of this study is to examine the factors that lead to successful outcomes in construction projects in Vietnam. Using the case study research design, three successful projects and another three unsuccessful projects were investigated. Data were collected from face-to-face interviews with several project participants in each project and archival data. The results show that major enablers that lead to project success are foreign experts’ involvement in the project, government officials inspecting the project, and very close supervision when new construction techniques are employed. A factor which leads to poor performance is the lack of accurate data on soil, weather, and traffic conditions. The findings may be useful to construction professionals operating in Vietnam to put in place factors that can lead to good project performance. For foreign practitioners entering Vietnam’s market, the study may assist them in focusing on the more important factors to achieve good project outcomes.
    • Download: (552.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Factors Affecting Construction Project Outcomes: Case Study of Vietnam

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/60274
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    Show full item record

    contributor authorFlorence Yean Yng Ling
    contributor authorThi Thuy Dung Bui
    date accessioned2017-05-08T21:42:45Z
    date available2017-05-08T21:42:45Z
    date copyrightJuly 2010
    date issued2010
    identifier other%28asce%29ei%2E1943-5541%2E0000022.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/60274
    description abstractDue to the demand for built products from foreign investors and the growing economy, Vietnam’s construction industry experiences strong growth. While some of the construction projects are successfully executed, others faced difficulties. The aim of this study is to examine the factors that lead to successful outcomes in construction projects in Vietnam. Using the case study research design, three successful projects and another three unsuccessful projects were investigated. Data were collected from face-to-face interviews with several project participants in each project and archival data. The results show that major enablers that lead to project success are foreign experts’ involvement in the project, government officials inspecting the project, and very close supervision when new construction techniques are employed. A factor which leads to poor performance is the lack of accurate data on soil, weather, and traffic conditions. The findings may be useful to construction professionals operating in Vietnam to put in place factors that can lead to good project performance. For foreign practitioners entering Vietnam’s market, the study may assist them in focusing on the more important factors to achieve good project outcomes.
    publisherAmerican Society of Civil Engineers
    titleFactors Affecting Construction Project Outcomes: Case Study of Vietnam
    typeJournal Paper
    journal volume136
    journal issue3
    journal titleJournal of Professional Issues in Engineering Education and Practice
    identifier doi10.1061/(ASCE)EI.1943-5541.0000013
    treeJournal of Professional Issues in Engineering Education and Practice:;2010:;Volume ( 136 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian