YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Applying Basic Control Theory Principles to Project Control: Case Study of Off-Site Construction Shops

    Source: Journal of Computing in Civil Engineering:;2012:;Volume ( 026 ):;issue: 006
    Author:
    Reza Azimi
    ,
    SangHyun Lee
    ,
    Simaan M. AbouRizk
    DOI: 10.1061/(ASCE)CP.1943-5487.0000190
    Publisher: American Society of Civil Engineers
    Abstract: Off-site construction has become increasingly popular in industrial construction projects over the past decade due to its advantages: higher productivity, better quality, better safety, and improved time and cost effectiveness. The fast-paced nature of off-site construction environments and the constraints induced by the construction site, along with the existing limitations within the shop, make the control process of off-site construction quite challenging. High-quality real-time data provided by utilizing new technologies can significantly improve and speed up the process of monitoring projects and identifying possible deviations; however, to be effective, decisions on corrective measures have to be made as quickly as possible. This paper presents an enhanced method based on the control theory concept for taking timely corrective actions to control the dynamic and fast-paced environments of off-site construction shops. The proposed method allows project managers to perform punctual nonlinear data analysis and predict the behavior of the performance of the shop. This leads to promptly determining the best corrective action in the case of variance to achieve a desired performance level with minimum cost. To illustrate its feasibility and potential for improving project control, the proposed approach was successfully implemented in an actual off-site structural steel fabrication shop.
    • Download: (253.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Applying Basic Control Theory Principles to Project Control: Case Study of Off-Site Construction Shops

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/59167
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorReza Azimi
    contributor authorSangHyun Lee
    contributor authorSimaan M. AbouRizk
    date accessioned2017-05-08T21:40:34Z
    date available2017-05-08T21:40:34Z
    date copyrightNovember 2012
    date issued2012
    identifier other%28asce%29cp%2E1943-5487%2E0000197.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/59167
    description abstractOff-site construction has become increasingly popular in industrial construction projects over the past decade due to its advantages: higher productivity, better quality, better safety, and improved time and cost effectiveness. The fast-paced nature of off-site construction environments and the constraints induced by the construction site, along with the existing limitations within the shop, make the control process of off-site construction quite challenging. High-quality real-time data provided by utilizing new technologies can significantly improve and speed up the process of monitoring projects and identifying possible deviations; however, to be effective, decisions on corrective measures have to be made as quickly as possible. This paper presents an enhanced method based on the control theory concept for taking timely corrective actions to control the dynamic and fast-paced environments of off-site construction shops. The proposed method allows project managers to perform punctual nonlinear data analysis and predict the behavior of the performance of the shop. This leads to promptly determining the best corrective action in the case of variance to achieve a desired performance level with minimum cost. To illustrate its feasibility and potential for improving project control, the proposed approach was successfully implemented in an actual off-site structural steel fabrication shop.
    publisherAmerican Society of Civil Engineers
    titleApplying Basic Control Theory Principles to Project Control: Case Study of Off-Site Construction Shops
    typeJournal Paper
    journal volume26
    journal issue6
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0000190
    treeJournal of Computing in Civil Engineering:;2012:;Volume ( 026 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian