YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Discovery of Internal and External Factors Causing Military Construction Cost Premiums

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 003
    Author:
    Daniel Blomberg
    ,
    Paul Cotellesso
    ,
    William Sitzabee
    ,
    Alfred E. Thal Jr.
    DOI: 10.1061/(ASCE)CO.1943-7862.0000810
    Publisher: American Society of Civil Engineers
    Abstract: Each year, the United States invests $30 billion in federal construction. Military construction (MILCON) represents 40% ($12 billion) of that capital investment. This study confirmed the existence of MILCON cost premiums compared with private sector construction through an analysis of existing research. This study also evaluated two nearly identical projects and used expert interviews and surveys to determine which factors influence the cost premiums. The projects represented a rare opportunity to compare projects that had the same end requirement: method of execution and acquisition, design/build and firm-fixed price; and location but differed by government construction agent. In addition to identifying the 28 factors that moderately or largely influence cost premiums, five overarching cost-premium themes emerged: failing to balance risk, additional public-sector requirements, stifling or not applying innovation, selection of construction specifications, and parameterization of the execution process. Additionally, once complete, two nearly identical projects differed by over a year of construction time and $7 million in spite of the contract requirement similarities. Research frequently cites federal laws and policies as the primary cost-premium driver; however, this research demonstrated that internal construction agent policies also cause increased cost premiums. Mitigating the causes of internal cost premiums could improve public-sector construction cost performance.
    • Download: (216.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Discovery of Internal and External Factors Causing Military Construction Cost Premiums

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/58969
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDaniel Blomberg
    contributor authorPaul Cotellesso
    contributor authorWilliam Sitzabee
    contributor authorAlfred E. Thal Jr.
    date accessioned2017-05-08T21:40:14Z
    date available2017-05-08T21:40:14Z
    date copyrightMarch 2014
    date issued2014
    identifier other%28asce%29cp%2E1943-5487%2E0000003.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58969
    description abstractEach year, the United States invests $30 billion in federal construction. Military construction (MILCON) represents 40% ($12 billion) of that capital investment. This study confirmed the existence of MILCON cost premiums compared with private sector construction through an analysis of existing research. This study also evaluated two nearly identical projects and used expert interviews and surveys to determine which factors influence the cost premiums. The projects represented a rare opportunity to compare projects that had the same end requirement: method of execution and acquisition, design/build and firm-fixed price; and location but differed by government construction agent. In addition to identifying the 28 factors that moderately or largely influence cost premiums, five overarching cost-premium themes emerged: failing to balance risk, additional public-sector requirements, stifling or not applying innovation, selection of construction specifications, and parameterization of the execution process. Additionally, once complete, two nearly identical projects differed by over a year of construction time and $7 million in spite of the contract requirement similarities. Research frequently cites federal laws and policies as the primary cost-premium driver; however, this research demonstrated that internal construction agent policies also cause increased cost premiums. Mitigating the causes of internal cost premiums could improve public-sector construction cost performance.
    publisherAmerican Society of Civil Engineers
    titleDiscovery of Internal and External Factors Causing Military Construction Cost Premiums
    typeJournal Paper
    journal volume140
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000810
    treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian