YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Fast and Near-Optimum Schedule Optimization for Large-Scale Projects

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 009
    Author:
    Wail Menesi
    ,
    Behrooz Golzarpoor
    ,
    Tarek Hegazy
    DOI: 10.1061/(ASCE)CO.1943-7862.0000722
    Publisher: American Society of Civil Engineers
    Abstract: Real-life construction projects are large in size and are challenged by many constraints, including strict deadlines and resource limits. In this paper, constraint programming (CP) is used as an advanced mathematical technique that suits schedule optimization problems. A practical CP optimization model has been developed to resolve both deadline and resource constraints simultaneously in large-scale projects. The proposed CP model is much faster than metaheuristic techniques and provides a set of feasible project durations that do not violate resource limits. The paper compares the CP results with several case studies from the literature to prove the practicality and usefulness of the CP approach to both researchers and practitioners. The CP model of this paper could provide solutions within 6.5% deviation from optimum schedules for a large project of 2,000 activities within minutes of processing time. This paper thus contributes to introducing a superior optimization model that is suitable for large-size projects and helps to render schedule optimization a mainstream cost-saving function within commercial scheduling systems.
    • Download: (234.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Fast and Near-Optimum Schedule Optimization for Large-Scale Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/58880
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWail Menesi
    contributor authorBehrooz Golzarpoor
    contributor authorTarek Hegazy
    date accessioned2017-05-08T21:40:01Z
    date available2017-05-08T21:40:01Z
    date copyrightSeptember 2013
    date issued2013
    identifier other%28asce%29co%2E1943-7862%2E0000731.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58880
    description abstractReal-life construction projects are large in size and are challenged by many constraints, including strict deadlines and resource limits. In this paper, constraint programming (CP) is used as an advanced mathematical technique that suits schedule optimization problems. A practical CP optimization model has been developed to resolve both deadline and resource constraints simultaneously in large-scale projects. The proposed CP model is much faster than metaheuristic techniques and provides a set of feasible project durations that do not violate resource limits. The paper compares the CP results with several case studies from the literature to prove the practicality and usefulness of the CP approach to both researchers and practitioners. The CP model of this paper could provide solutions within 6.5% deviation from optimum schedules for a large project of 2,000 activities within minutes of processing time. This paper thus contributes to introducing a superior optimization model that is suitable for large-size projects and helps to render schedule optimization a mainstream cost-saving function within commercial scheduling systems.
    publisherAmerican Society of Civil Engineers
    titleFast and Near-Optimum Schedule Optimization for Large-Scale Projects
    typeJournal Paper
    journal volume139
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000722
    treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian