YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 012
    Author:
    Dho Heon Jun
    ,
    Khaled El-Rayes
    DOI: 10.1061/(ASCE)CO.1943-7862.0000368
    Publisher: American Society of Civil Engineers
    Abstract: Construction scheduling techniques often generate schedules that cause undesirable resource fluctuations that are inefficient and costly to implement on site. This paper presents the development of a novel multiobjective optimization model that is capable of measuring and minimizing these undesirable resource fluctuations to maximize resource utilization efficiency and minimize project duration while complying with all precedence relationships and resource availability constraints. The model incorporates three main modules: (1) a startup module that calculates lower and upper bounds for the model decision variables; (2) a scheduling module that generates practical schedules and evaluates their performance; and (3) a multiobjective genetic algorithm module that searches for and identifies optimal schedules. The model is integrated in a commercially available software system to facilitate its use and adoption by construction planners. An application example is analyzed to illustrate the use of the model and demonstrate its new and unique capabilities in generating optimal trade-offs between maximizing resource utilization efficiency and minimizing the duration of construction projects.
    • Download: (885.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/58527
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDho Heon Jun
    contributor authorKhaled El-Rayes
    date accessioned2017-05-08T21:39:27Z
    date available2017-05-08T21:39:27Z
    date copyrightDecember 2011
    date issued2011
    identifier other%28asce%29co%2E1943-7862%2E0000375.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58527
    description abstractConstruction scheduling techniques often generate schedules that cause undesirable resource fluctuations that are inefficient and costly to implement on site. This paper presents the development of a novel multiobjective optimization model that is capable of measuring and minimizing these undesirable resource fluctuations to maximize resource utilization efficiency and minimize project duration while complying with all precedence relationships and resource availability constraints. The model incorporates three main modules: (1) a startup module that calculates lower and upper bounds for the model decision variables; (2) a scheduling module that generates practical schedules and evaluates their performance; and (3) a multiobjective genetic algorithm module that searches for and identifies optimal schedules. The model is integrated in a commercially available software system to facilitate its use and adoption by construction planners. An application example is analyzed to illustrate the use of the model and demonstrate its new and unique capabilities in generating optimal trade-offs between maximizing resource utilization efficiency and minimizing the duration of construction projects.
    publisherAmerican Society of Civil Engineers
    titleMultiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling
    typeJournal Paper
    journal volume137
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000368
    treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian