YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 009
    Author:
    Engy Serag
    ,
    Amr Oloufa
    ,
    Linda Malone
    ,
    Essam Radwan
    DOI: 10.1061/(ASCE)CO.1943-7862.0000206
    Publisher: American Society of Civil Engineers
    Abstract: Change orders are very common in almost every construction project nowadays, often resulting in increases of 5–10% in the contract price. Understanding the consequences of such trends, several studies have attempted to quantify the impact of change orders on the project cost. Most of the studies aimed at the quantification of the change orders were sponsored by contractors’ organizations, where statistical models used to quantify the impact of the change orders on the project cost were based on data supplied by the contractors; a situation that can lead to owner-contractor disagreements related to the quantification method used. In addition, most of the studies tackled commercial and electromechanical work, and very rare studies tackled the field of heavy construction; a field that suffers from change orders because of errors and omissions, scope of work changes, or changes because of unforeseen conditions. This study addresses the need for a statistical model to quantify the increase of the contract price due to change orders in heavy construction projects in Florida. The model is based on data collected from 16 Florida DOT projects with contract values that ranged between $10–$25 million, and that encountered an increase in the contract price from 0.01 to 15%. Eleven variables were analyzed to test their impact on the cost of the change orders. The study concluded that most significant variables that impact the value of the change order, which are (1) the timing of the change order and (2) when the reason for issuing the change order is unforeseen conditions. Two regression models are developed and validated as follows: (1) a model to quantify the percentage increase in the contract price due to the change orders that increase the contract price from 0.01 to 5% and (2) a model to quantify the percentage increase in the contract price due to the change orders that increase the contract price from 5 to 15%. Those models will provide the owner with a retrospective or forward pricing of the change orders, and hence, allow the owner to estimate and utilize contingency amounts.
    • Download: (204.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/58359
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorEngy Serag
    contributor authorAmr Oloufa
    contributor authorLinda Malone
    contributor authorEssam Radwan
    date accessioned2017-05-08T21:39:09Z
    date available2017-05-08T21:39:09Z
    date copyrightSeptember 2010
    date issued2010
    identifier other%28asce%29co%2E1943-7862%2E0000214.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58359
    description abstractChange orders are very common in almost every construction project nowadays, often resulting in increases of 5–10% in the contract price. Understanding the consequences of such trends, several studies have attempted to quantify the impact of change orders on the project cost. Most of the studies aimed at the quantification of the change orders were sponsored by contractors’ organizations, where statistical models used to quantify the impact of the change orders on the project cost were based on data supplied by the contractors; a situation that can lead to owner-contractor disagreements related to the quantification method used. In addition, most of the studies tackled commercial and electromechanical work, and very rare studies tackled the field of heavy construction; a field that suffers from change orders because of errors and omissions, scope of work changes, or changes because of unforeseen conditions. This study addresses the need for a statistical model to quantify the increase of the contract price due to change orders in heavy construction projects in Florida. The model is based on data collected from 16 Florida DOT projects with contract values that ranged between $10–$25 million, and that encountered an increase in the contract price from 0.01 to 15%. Eleven variables were analyzed to test their impact on the cost of the change orders. The study concluded that most significant variables that impact the value of the change order, which are (1) the timing of the change order and (2) when the reason for issuing the change order is unforeseen conditions. Two regression models are developed and validated as follows: (1) a model to quantify the percentage increase in the contract price due to the change orders that increase the contract price from 0.01 to 5% and (2) a model to quantify the percentage increase in the contract price due to the change orders that increase the contract price from 5 to 15%. Those models will provide the owner with a retrospective or forward pricing of the change orders, and hence, allow the owner to estimate and utilize contingency amounts.
    publisherAmerican Society of Civil Engineers
    titleModel for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction
    typeJournal Paper
    journal volume136
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000206
    treeJournal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian