YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Time, Cost, and Quality in a Road Building Project

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 011
    Author:
    José Ramón San Cristóbal
    DOI: 10.1061/(ASCE)CO.1943-7862.0000094
    Publisher: American Society of Civil Engineers
    Abstract: Time, cost and quality are the three factors that play a significant role in the planning and controlling of construction projects. The main barriers for their achievement are the changes in the project environment necessitating cost, time, and quality trade-offs. Literature has mainly focused on analyzing time and cost with little or no reported research focusing on models for optimizing construction time, cost, and quality jointly. Government agencies have recently started using new types of contracting methods which have placed an increasing pressure on decision makers in the construction industry to search for an optimal/near optimal resource utilization plan that minimizes construction cost and time while maximizing its quality. In this paper, a 0-1 Integer Programming model which enables meeting quality output standards and time and budget objectives respectively is developed. The clever use of binary variables allows us to solve many interesting and difficult problems and our ability to model complex problems increases tremendously when we use binary variables. A version of the model to minimize time meeting quality and cost objectives is applied to a road building project. Two alternatives versions of the model which enable to minimize cost meeting quality and time and to maximize quality meeting time and cost, are shown in an Appendix.
    • Download: (59.58Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Time, Cost, and Quality in a Road Building Project

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/58240
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJosé Ramón San Cristóbal
    date accessioned2017-05-08T21:38:59Z
    date available2017-05-08T21:38:59Z
    date copyrightNovember 2009
    date issued2009
    identifier other%28asce%29co%2E1943-7862%2E0000100.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58240
    description abstractTime, cost and quality are the three factors that play a significant role in the planning and controlling of construction projects. The main barriers for their achievement are the changes in the project environment necessitating cost, time, and quality trade-offs. Literature has mainly focused on analyzing time and cost with little or no reported research focusing on models for optimizing construction time, cost, and quality jointly. Government agencies have recently started using new types of contracting methods which have placed an increasing pressure on decision makers in the construction industry to search for an optimal/near optimal resource utilization plan that minimizes construction cost and time while maximizing its quality. In this paper, a 0-1 Integer Programming model which enables meeting quality output standards and time and budget objectives respectively is developed. The clever use of binary variables allows us to solve many interesting and difficult problems and our ability to model complex problems increases tremendously when we use binary variables. A version of the model to minimize time meeting quality and cost objectives is applied to a road building project. Two alternatives versions of the model which enable to minimize cost meeting quality and time and to maximize quality meeting time and cost, are shown in an Appendix.
    publisherAmerican Society of Civil Engineers
    titleTime, Cost, and Quality in a Road Building Project
    typeJournal Paper
    journal volume135
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000094
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian