YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Analysis of the Design-Build Delivery Method in Air Force Construction Projects

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 008
    Author:
    James W. Rosner
    ,
    Alfred E. Thal Jr.
    ,
    Christopher J. West
    DOI: 10.1061/(ASCE)CO.1943-7862.0000029
    Publisher: American Society of Civil Engineers
    Abstract: The design-build (DB) method for construction project delivery continues to grow in both the private and public sector; additionally, research has shown that the DB method outperforms the design-bid-build (DBB) method. The Air Force has applied the results of these previous research efforts to its military construction (MILCON) program without performing empirical studies to validate the approach. Therefore, the objective of this study was to compare the performance of the DB delivery method with the traditional DBB approach for the Air Force MILCON program. Data related to 835 (278 DB and 557 DBB) MILCON projects for fiscal years 1996–2006 were subsequently analyzed. The DB method had better performance in three of six metrics with the performance being significantly better for cost growth and the number of modifications per million dollars. The traditional DBB method performed significantly better in terms of total project time. Furthermore, the DB method was best suited for various facility types. This study provides empirical evidence of how the DB method provides an advantage over the traditional DBB method for Air Force MILCON projects.
    • Download: (395.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Analysis of the Design-Build Delivery Method in Air Force Construction Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/58188
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJames W. Rosner
    contributor authorAlfred E. Thal Jr.
    contributor authorChristopher J. West
    date accessioned2017-05-08T21:38:55Z
    date available2017-05-08T21:38:55Z
    date copyrightAugust 2009
    date issued2009
    identifier other%28asce%29co%2E1943-7862%2E0000034.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58188
    description abstractThe design-build (DB) method for construction project delivery continues to grow in both the private and public sector; additionally, research has shown that the DB method outperforms the design-bid-build (DBB) method. The Air Force has applied the results of these previous research efforts to its military construction (MILCON) program without performing empirical studies to validate the approach. Therefore, the objective of this study was to compare the performance of the DB delivery method with the traditional DBB approach for the Air Force MILCON program. Data related to 835 (278 DB and 557 DBB) MILCON projects for fiscal years 1996–2006 were subsequently analyzed. The DB method had better performance in three of six metrics with the performance being significantly better for cost growth and the number of modifications per million dollars. The traditional DBB method performed significantly better in terms of total project time. Furthermore, the DB method was best suited for various facility types. This study provides empirical evidence of how the DB method provides an advantage over the traditional DBB method for Air Force MILCON projects.
    publisherAmerican Society of Civil Engineers
    titleAnalysis of the Design-Build Delivery Method in Air Force Construction Projects
    typeJournal Paper
    journal volume135
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000029
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian