| contributor author | Jimmie Hinze | |
| contributor author | Svetlana Olbina | |
| date accessioned | 2017-05-08T21:38:52Z | |
| date available | 2017-05-08T21:38:52Z | |
| date copyright | May 2009 | |
| date issued | 2009 | |
| identifier other | %28asce%29co%2E1943-7862%2E0000009.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/58159 | |
| description abstract | The principle of learning curves can be applied in construction for the prediction of the time/cycle of future work, work performance levels, and other performance measures. Learning curve principles can be effectively utilized in litigation cases where production is compromised by delays. The objective of this study was to determine if learning curves could be used to accurately predict the production efforts of future units by applying the principles to the prefabrication and driving of prestressed concrete piles. The individual time to cast each of the concrete piles was recorded and used to compute the cumulative average time | |
| publisher | American Society of Civil Engineers | |
| title | Empirical Analysis of the Learning Curve Principle in Prestressed Concrete Piles | |
| type | Journal Paper | |
| journal volume | 135 | |
| journal issue | 5 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)CO.1943-7862.0000004 | |
| tree | Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 005 | |
| contenttype | Fulltext | |