YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Conceptual Design of Superspan Partial Ground-Anchored Cable-Stayed Bridge with Crossing Stay Cables

    Source: Journal of Bridge Engineering:;2014:;Volume ( 019 ):;issue: 003
    Author:
    Xudong
    ,
    Shao
    ,
    Jia
    ,
    Hu
    ,
    Lu
    ,
    Deng
    ,
    Junhui
    ,
    Cao
    DOI: 10.1061/(ASCE)BE.1943-5592.0000534
    Publisher: American Society of Civil Engineers
    Abstract: As the span of conventional cable-stayed bridges reaches 1,200 m or longer, accumulated horizontal force components of the stay cables cause huge axial pressure in the girder, leading to sharp increases of girder dimension and weight, which makes it difficult to compete with suspension bridges in terms of economic consideration. In this paper, a new type of cable-stayed bridge is proposed, namely the partial ground-anchored cable-stayed bridge with crossing stay cables. In this new cable-stayed bridge system, long stay cables cross with each other in the midspan zone of the main span while the other ends of the long cables are anchored to the ground in the side spans. By this design, the long cables result in no additional horizontal pressure to the main girder, and the ratio of pylon height to span length can be reduced. A comparative analysis of this new bridge system with a conventional self-anchored cable-stayed bridge with a main span of 1,408 m is carried out. Results show that by using the new bridge system, the horizontal pressure in the main girder can be reduced by 29.6%, and the total cost can be reduced by 11.8%. Furthermore, the size of ground anchors for this new bridge system is only about 30% of that of a suspension bridge with the same span length. Finally, a cantilever construction method for the new bridge system is introduced as well.
    • Download: (5.838Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Conceptual Design of Superspan Partial Ground-Anchored Cable-Stayed Bridge with Crossing Stay Cables

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/57084
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorXudong
    contributor authorShao
    contributor authorJia
    contributor authorHu
    contributor authorLu
    contributor authorDeng
    contributor authorJunhui
    contributor authorCao
    date accessioned2017-05-08T21:35:53Z
    date available2017-05-08T21:35:53Z
    date copyrightMarch 2014
    date issued2014
    identifier other%28asce%29be%2E1943-5592%2E0000536.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/57084
    description abstractAs the span of conventional cable-stayed bridges reaches 1,200 m or longer, accumulated horizontal force components of the stay cables cause huge axial pressure in the girder, leading to sharp increases of girder dimension and weight, which makes it difficult to compete with suspension bridges in terms of economic consideration. In this paper, a new type of cable-stayed bridge is proposed, namely the partial ground-anchored cable-stayed bridge with crossing stay cables. In this new cable-stayed bridge system, long stay cables cross with each other in the midspan zone of the main span while the other ends of the long cables are anchored to the ground in the side spans. By this design, the long cables result in no additional horizontal pressure to the main girder, and the ratio of pylon height to span length can be reduced. A comparative analysis of this new bridge system with a conventional self-anchored cable-stayed bridge with a main span of 1,408 m is carried out. Results show that by using the new bridge system, the horizontal pressure in the main girder can be reduced by 29.6%, and the total cost can be reduced by 11.8%. Furthermore, the size of ground anchors for this new bridge system is only about 30% of that of a suspension bridge with the same span length. Finally, a cantilever construction method for the new bridge system is introduced as well.
    publisherAmerican Society of Civil Engineers
    titleConceptual Design of Superspan Partial Ground-Anchored Cable-Stayed Bridge with Crossing Stay Cables
    typeJournal Paper
    journal volume19
    journal issue3
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0000534
    treeJournal of Bridge Engineering:;2014:;Volume ( 019 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian