YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Imaging Tools for Evaluation of Gusset Plate Connections in Steel Truss Bridges

    Source: Journal of Bridge Engineering:;2013:;Volume ( 018 ):;issue: 005
    Author:
    Christopher
    ,
    Higgins
    ,
    O. Tugrul
    ,
    Turan
    DOI: 10.1061/(ASCE)BE.1943-5592.0000358
    Publisher: American Society of Civil Engineers
    Abstract: After the collapse of the Interstate 35W Bridge in Minneapolis, Minnesota, in 2007, transportation agencies began evaluating and rating their inventories of gusset plate connections. Connection evaluations require accurate drawings that detail the plate, member, and fastener geometries. These structural details should also accurately reflect the as-built conditions. For some connections, as-built information may not be available, or the available drawings may not represent the actual field conditions. To fill this gap, a new methodology was developed that enables rapid and accurate collection of field measurements for connection plate geometry. The method uses close-range photogrammetry techniques to rectify images taken with consumer-grade cameras using flat-field and fish-eye lenses. The technique has been demonstrated on full-scale gusset plates in the laboratory and in the field. Dimensional measurements from the processed images provided results that are as good as or better than conventional field measurements and with tolerances below what most engineers require for calculation of gusset plate connection capacity. This technique provides a new tool for bridge engineers to quickly collect gusset plate geometry that can be used in connection evaluations and rating and can further enhance bridge-management tasks.
    • Download: (2.558Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Imaging Tools for Evaluation of Gusset Plate Connections in Steel Truss Bridges

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/56902
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorChristopher
    contributor authorHiggins
    contributor authorO. Tugrul
    contributor authorTuran
    date accessioned2017-05-08T21:35:24Z
    date available2017-05-08T21:35:24Z
    date copyrightMay 2013
    date issued2013
    identifier other%28asce%29be%2E1943-5592%2E0000360.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56902
    description abstractAfter the collapse of the Interstate 35W Bridge in Minneapolis, Minnesota, in 2007, transportation agencies began evaluating and rating their inventories of gusset plate connections. Connection evaluations require accurate drawings that detail the plate, member, and fastener geometries. These structural details should also accurately reflect the as-built conditions. For some connections, as-built information may not be available, or the available drawings may not represent the actual field conditions. To fill this gap, a new methodology was developed that enables rapid and accurate collection of field measurements for connection plate geometry. The method uses close-range photogrammetry techniques to rectify images taken with consumer-grade cameras using flat-field and fish-eye lenses. The technique has been demonstrated on full-scale gusset plates in the laboratory and in the field. Dimensional measurements from the processed images provided results that are as good as or better than conventional field measurements and with tolerances below what most engineers require for calculation of gusset plate connection capacity. This technique provides a new tool for bridge engineers to quickly collect gusset plate geometry that can be used in connection evaluations and rating and can further enhance bridge-management tasks.
    publisherAmerican Society of Civil Engineers
    titleImaging Tools for Evaluation of Gusset Plate Connections in Steel Truss Bridges
    typeJournal Paper
    journal volume18
    journal issue5
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0000358
    treeJournal of Bridge Engineering:;2013:;Volume ( 018 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian