YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Effect of Temporary Shoring Location on Horizontally Curved Steel I-Girder Bridges during Construction

    Source: Journal of Bridge Engineering:;2012:;Volume ( 017 ):;issue: 003
    Author:
    M. Sharafbayani
    ,
    D. G. Linzell
    DOI: 10.1061/(ASCE)BE.1943-5592.0000269
    Publisher: American Society of Civil Engineers
    Abstract: Temporary shoring supports are used in construction of horizontally curved bridges to help ensure that the final constructed geometry is maintained by mitigating excessive girder deformations. Limited guidance currently exists in available design specifications and guidelines with respect to optimal placement of shoring towers because the number and locations of these supports are often site specific. However, if preliminary information could be provided to bridge designers and constructors with respect to shoring tower placement as a function of global curved bridge parameters, such as number of spans and radius of curvature, the amount of time required to specifically locate and proportion the towers could be reduced. This research aimed to examine the effects of shoring tower positioning on curved bridge behavior at different stages of construction. Sequential analyses of multiple idealized double-span curved bridges with varying radii were conducted using nonlinear finite-element models and vertical deformations and rotations of the girders, and shoring tower reactions were compared for different shoring support locations and different erection sequences. On the basis of the results, optimal shoring locations were obtained for the curved girders at different construction stages.
    • Download: (832.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Effect of Temporary Shoring Location on Horizontally Curved Steel I-Girder Bridges during Construction

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/56811
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorM. Sharafbayani
    contributor authorD. G. Linzell
    date accessioned2017-05-08T21:35:14Z
    date available2017-05-08T21:35:14Z
    date copyrightMay 2012
    date issued2012
    identifier other%28asce%29be%2E1943-5592%2E0000271.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56811
    description abstractTemporary shoring supports are used in construction of horizontally curved bridges to help ensure that the final constructed geometry is maintained by mitigating excessive girder deformations. Limited guidance currently exists in available design specifications and guidelines with respect to optimal placement of shoring towers because the number and locations of these supports are often site specific. However, if preliminary information could be provided to bridge designers and constructors with respect to shoring tower placement as a function of global curved bridge parameters, such as number of spans and radius of curvature, the amount of time required to specifically locate and proportion the towers could be reduced. This research aimed to examine the effects of shoring tower positioning on curved bridge behavior at different stages of construction. Sequential analyses of multiple idealized double-span curved bridges with varying radii were conducted using nonlinear finite-element models and vertical deformations and rotations of the girders, and shoring tower reactions were compared for different shoring support locations and different erection sequences. On the basis of the results, optimal shoring locations were obtained for the curved girders at different construction stages.
    publisherAmerican Society of Civil Engineers
    titleEffect of Temporary Shoring Location on Horizontally Curved Steel I-Girder Bridges during Construction
    typeJournal Paper
    journal volume17
    journal issue3
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0000269
    treeJournal of Bridge Engineering:;2012:;Volume ( 017 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian