YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Life-Cycle Cost Analyses of a New Steel for Bridges

    Source: Journal of Bridge Engineering:;2012:;Volume ( 017 ):;issue: 001
    Author:
    Nader M. Okasha
    ,
    Dan M. Frangopol
    ,
    Fred B. Fletcher
    ,
    Alex D. Wilson
    DOI: 10.1061/(ASCE)BE.1943-5592.0000219
    Publisher: American Society of Civil Engineers
    Abstract: This technical note presents the computations, results, and conclusions of an analytical investigation for comparing the life-cycle cost (LCC) of a steel bridge component made of a new maintenance-free steel and the LCC of the same steel bridge component made of conventional painted carbon steel with maintenance (repainting). An approach for the LCC analysis is presented both deterministically, where different painting scenarios are considered, and probabilistically, where the uncertainties in the input variables are properly considered. Under reasonable cost assumptions, it is demonstrated that the new steel, although initially more expensive, is indeed cost-effective after approximately 15 years. The LCC-effectiveness of the new steel increases over the service life of the bridge component.
    • Download: (751.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Life-Cycle Cost Analyses of a New Steel for Bridges

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/56757
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorNader M. Okasha
    contributor authorDan M. Frangopol
    contributor authorFred B. Fletcher
    contributor authorAlex D. Wilson
    date accessioned2017-05-08T21:35:06Z
    date available2017-05-08T21:35:06Z
    date copyrightJanuary 2012
    date issued2012
    identifier other%28asce%29be%2E1943-5592%2E0000221.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56757
    description abstractThis technical note presents the computations, results, and conclusions of an analytical investigation for comparing the life-cycle cost (LCC) of a steel bridge component made of a new maintenance-free steel and the LCC of the same steel bridge component made of conventional painted carbon steel with maintenance (repainting). An approach for the LCC analysis is presented both deterministically, where different painting scenarios are considered, and probabilistically, where the uncertainties in the input variables are properly considered. Under reasonable cost assumptions, it is demonstrated that the new steel, although initially more expensive, is indeed cost-effective after approximately 15 years. The LCC-effectiveness of the new steel increases over the service life of the bridge component.
    publisherAmerican Society of Civil Engineers
    titleLife-Cycle Cost Analyses of a New Steel for Bridges
    typeJournal Paper
    journal volume17
    journal issue1
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0000219
    treeJournal of Bridge Engineering:;2012:;Volume ( 017 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian