YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Evaluation of Application of Lean Principles to Precast Concrete Bridge Beam Production Process

    Source: Journal of Architectural Engineering:;2012:;Volume ( 018 ):;issue: 002
    Author:
    Sepani Senaratne
    ,
    Shanika Ekanayake
    DOI: 10.1061/(ASCE)AE.1943-5568.0000063
    Publisher: American Society of Civil Engineers
    Abstract: Although prefabrication is becoming popular as an approach to conquer the chronic problems in construction, it has inherent issues related to inefficiencies in its production process. To address these production process related inefficiencies, lean production principles (LPP) can be applied. Hence, this paper aims to investigate the application of LPP to the precast concrete bridge beam production process (PCBBPP). The research collected data within three selected case studies by observing PCBBPP and interviewing executive-level professionals, to map the process, to identify conversion activities and their efficiency enhancing methods, and to record flow activities and their associate waste, waste causes, and elimination/minimization methods. The research analysed data by using code-based content analysis, and the findings are presented by using tables, matrices, and maps. The results revealed 103 activities associated with PCBBPP, of which 59 are conversion activities. Among 44 flow activities, 17 can be eliminated. The results also indicated several methods and techniques to eliminate/minimize flow activities and enhance the efficiency of PCBBPP conversion activities to enable implementation of LPP in prefabrication yards. By applying LPP to PCBBPP, several long-term benefits were revealed that contribute to sustainable construction. These results are useful for prefabrication companies and those who deal with sustainability issues.
    • Download: (1.760Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Evaluation of Application of Lean Principles to Precast Concrete Bridge Beam Production Process

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/56066
    Collections
    • Journal of Architectural Engineering

    Show full item record

    contributor authorSepani Senaratne
    contributor authorShanika Ekanayake
    date accessioned2017-05-08T21:33:29Z
    date available2017-05-08T21:33:29Z
    date copyrightJune 2012
    date issued2012
    identifier other%28asce%29ae%2E1943-5568%2E0000063.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56066
    description abstractAlthough prefabrication is becoming popular as an approach to conquer the chronic problems in construction, it has inherent issues related to inefficiencies in its production process. To address these production process related inefficiencies, lean production principles (LPP) can be applied. Hence, this paper aims to investigate the application of LPP to the precast concrete bridge beam production process (PCBBPP). The research collected data within three selected case studies by observing PCBBPP and interviewing executive-level professionals, to map the process, to identify conversion activities and their efficiency enhancing methods, and to record flow activities and their associate waste, waste causes, and elimination/minimization methods. The research analysed data by using code-based content analysis, and the findings are presented by using tables, matrices, and maps. The results revealed 103 activities associated with PCBBPP, of which 59 are conversion activities. Among 44 flow activities, 17 can be eliminated. The results also indicated several methods and techniques to eliminate/minimize flow activities and enhance the efficiency of PCBBPP conversion activities to enable implementation of LPP in prefabrication yards. By applying LPP to PCBBPP, several long-term benefits were revealed that contribute to sustainable construction. These results are useful for prefabrication companies and those who deal with sustainability issues.
    publisherAmerican Society of Civil Engineers
    titleEvaluation of Application of Lean Principles to Precast Concrete Bridge Beam Production Process
    typeJournal Paper
    journal volume18
    journal issue2
    journal titleJournal of Architectural Engineering
    identifier doi10.1061/(ASCE)AE.1943-5568.0000063
    treeJournal of Architectural Engineering:;2012:;Volume ( 018 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian