YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Early‐Completion Schedules: The Promise and Pitfalls

    Source: Journal of Management in Engineering:;1994:;Volume ( 010 ):;issue: 001
    Author:
    Roy Mendelsohn
    DOI: 10.1061/(ASCE)9742-597X(1994)10:1(28)
    Publisher: American Society of Civil Engineers
    Abstract: The general perception of construction projects is that they are more likely to be completed late than early or on‐time. In truth, some projects are delivered early due to unusually favorable weather, contractor‐suggested redesigns, the use of innovative construction methods, and contractor efforts to meet incentive clauses. Early competition is usually considered a benefit to all parties, however there are some negative aspects, which need to be carefully considered. Owners have received these early completion schedules with delight only to find that the may then become subject to claims for delay for any action deemed to be detrimental to the contractor's early‐completion schedule. The results for some have been to receive their projects on or about the time the contract originally required but with the added costs of delay claims. Owners and construction managers need to be aware of the potential problems involved with early completion. This article looks at the costs and benefits of early completion for the contractor, the owner and other parties.
    • Download: (761.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Early‐Completion Schedules: The Promise and Pitfalls

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/55940
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorRoy Mendelsohn
    date accessioned2017-05-08T21:33:16Z
    date available2017-05-08T21:33:16Z
    date copyrightJanuary 1994
    date issued1994
    identifier other%28asce%299742-597x%281994%2910%3A1%2828%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55940
    description abstractThe general perception of construction projects is that they are more likely to be completed late than early or on‐time. In truth, some projects are delivered early due to unusually favorable weather, contractor‐suggested redesigns, the use of innovative construction methods, and contractor efforts to meet incentive clauses. Early competition is usually considered a benefit to all parties, however there are some negative aspects, which need to be carefully considered. Owners have received these early completion schedules with delight only to find that the may then become subject to claims for delay for any action deemed to be detrimental to the contractor's early‐completion schedule. The results for some have been to receive their projects on or about the time the contract originally required but with the added costs of delay claims. Owners and construction managers need to be aware of the potential problems involved with early completion. This article looks at the costs and benefits of early completion for the contractor, the owner and other parties.
    publisherAmerican Society of Civil Engineers
    titleEarly‐Completion Schedules: The Promise and Pitfalls
    typeJournal Paper
    journal volume10
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)9742-597X(1994)10:1(28)
    treeJournal of Management in Engineering:;1994:;Volume ( 010 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian