YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quantifying Variations in Project‐Cost Estimates

    Source: Journal of Management in Engineering:;1990:;Volume ( 006 ):;issue: 001
    Author:
    Robert M. Bradley
    ,
    Michael G. Powell
    ,
    Michael R. Soulsby
    DOI: 10.1061/(ASCE)9742-597X(1990)6:1(99)
    Publisher: American Society of Civil Engineers
    Abstract: Traditional methods of estimating project costs do not attempt to assess the magnitude of the variation inherent in the estimate. As a result, there is a risk that decisions on strategy selection will be based on a high degree of uncertainty. Alternative approaches to cost estimating are available and this paper describes the method adopted for a major sewerage project in Kuala Lumpur, Malaysia. The component‐cost ranges and probability values are defined by a panel of estimators in order to reduce personal bias, and the alternative strategy costs are simulated on a random number basis, the values for each component being selected randomly within the specified ranges. The computed median costs are therefore defined within stated reliability ranges enabling the investment decisions to be taken with a higher degree of confidence.
    • Download: (626.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Quantifying Variations in Project‐Cost Estimates

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/55766
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorRobert M. Bradley
    contributor authorMichael G. Powell
    contributor authorMichael R. Soulsby
    date accessioned2017-05-08T21:33:00Z
    date available2017-05-08T21:33:00Z
    date copyrightJanuary 1990
    date issued1990
    identifier other%28asce%299742-597x%281990%296%3A1%2899%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55766
    description abstractTraditional methods of estimating project costs do not attempt to assess the magnitude of the variation inherent in the estimate. As a result, there is a risk that decisions on strategy selection will be based on a high degree of uncertainty. Alternative approaches to cost estimating are available and this paper describes the method adopted for a major sewerage project in Kuala Lumpur, Malaysia. The component‐cost ranges and probability values are defined by a panel of estimators in order to reduce personal bias, and the alternative strategy costs are simulated on a random number basis, the values for each component being selected randomly within the specified ranges. The computed median costs are therefore defined within stated reliability ranges enabling the investment decisions to be taken with a higher degree of confidence.
    publisherAmerican Society of Civil Engineers
    titleQuantifying Variations in Project‐Cost Estimates
    typeJournal Paper
    journal volume6
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)9742-597X(1990)6:1(99)
    treeJournal of Management in Engineering:;1990:;Volume ( 006 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian