YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Elements of Cost and Schedule Management

    Source: Journal of Management in Engineering:;1985:;Volume ( 001 ):;issue: 003
    Author:
    John P. Hribar
    ,
    Gregory E. Asbury
    DOI: 10.1061/(ASCE)9742-597X(1985)1:3(138)
    Publisher: American Society of Civil Engineers
    Abstract: Cost and schedule management is an effort that requires extensive use and control of data. A project coding system such as a Work Breakdown Structure is a key element in developing and controlling cost and schedule. Objectives and techniques used to manage cost and schedule are considered at the three basic stages of project development: Planning, design and construction. The greatest opportunity for cost and schedule control is at the early stages of a project. As a project moves through planning to construction, the detail known increases and thus the detail necessary in the cost and schedule system must increase. Bar charting may be acceptable as an exclusive scheduling tool during planning, but later must be replaced by a logic based technique such as the Critical Path Method. Cost estimates must be trended from original planning estimates as the project moves into design and construction. Exception reporting is the primary vehicle for upper management review of project cost and schedule data.
    • Download: (684.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Elements of Cost and Schedule Management

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/55576
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorJohn P. Hribar
    contributor authorGregory E. Asbury
    date accessioned2017-05-08T21:32:40Z
    date available2017-05-08T21:32:40Z
    date copyrightJuly 1985
    date issued1985
    identifier other%28asce%299742-597x%281985%291%3A3%28138%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55576
    description abstractCost and schedule management is an effort that requires extensive use and control of data. A project coding system such as a Work Breakdown Structure is a key element in developing and controlling cost and schedule. Objectives and techniques used to manage cost and schedule are considered at the three basic stages of project development: Planning, design and construction. The greatest opportunity for cost and schedule control is at the early stages of a project. As a project moves through planning to construction, the detail known increases and thus the detail necessary in the cost and schedule system must increase. Bar charting may be acceptable as an exclusive scheduling tool during planning, but later must be replaced by a logic based technique such as the Critical Path Method. Cost estimates must be trended from original planning estimates as the project moves into design and construction. Exception reporting is the primary vehicle for upper management review of project cost and schedule data.
    publisherAmerican Society of Civil Engineers
    titleElements of Cost and Schedule Management
    typeJournal Paper
    journal volume1
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)9742-597X(1985)1:3(138)
    treeJournal of Management in Engineering:;1985:;Volume ( 001 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian