YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Relief from Bid Mistakes

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2010:;Volume ( 002 ):;issue: 002
    Author:
    H. Randolph Thomas
    DOI: 10.1061/(ASCE)1943-4162(2010)2:2(120)
    Publisher: American Society of Civil Engineers
    Abstract: Contractor mistakes in the bidding of construction projects are not unusual occurrences and can delay the planned starting date of projects. It is important that mistakes be handled expeditiously and correctly. This paper analyzes several important court decisions related to bid mistakes to determine the inquiries an appellate court will ask and how it will react to the answers to its inquiries. The decision-making process is formulated in a flowchart format that models the judicial decision-making process. The flowchart can be used to analyze other disputes. Based on the analysis of court decisions, the judicial decision-making process was modeled and applied to a case study example. The outcome of the inquiry analysis was identical to that of the judicial decision.
    • Download: (86.91Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Relief from Bid Mistakes

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/55558
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorH. Randolph Thomas
    date accessioned2017-05-08T21:32:39Z
    date available2017-05-08T21:32:39Z
    date copyrightMay 2010
    date issued2010
    identifier other%28asce%291943-4162%282010%292%3A2%28120%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55558
    description abstractContractor mistakes in the bidding of construction projects are not unusual occurrences and can delay the planned starting date of projects. It is important that mistakes be handled expeditiously and correctly. This paper analyzes several important court decisions related to bid mistakes to determine the inquiries an appellate court will ask and how it will react to the answers to its inquiries. The decision-making process is formulated in a flowchart format that models the judicial decision-making process. The flowchart can be used to analyze other disputes. Based on the analysis of court decisions, the judicial decision-making process was modeled and applied to a case study example. The outcome of the inquiry analysis was identical to that of the judicial decision.
    publisherAmerican Society of Civil Engineers
    titleRelief from Bid Mistakes
    typeJournal Paper
    journal volume2
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)1943-4162(2010)2:2(120)
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2010:;Volume ( 002 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian