YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Leadership and Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Objectively Assessing Risk in a Complex World

    Source: Leadership and Management in Engineering:;2008:;Volume ( 008 ):;issue: 004
    Author:
    Jan Lyons
    DOI: 10.1061/(ASCE)1532-6748(2008)8:4(231)
    Publisher: American Society of Civil Engineers
    Abstract: When engineers think of risk management, it’s often in the context of events directly related to specific program elements—adequately addressing all design criteria, identifying and securing commitments for the necessary program resources, or executing the program plan within budget and schedule constraints. While risks specific to the engineering effort must be addressed and managed to support a successful program outcome, our increasingly complex and interdependent operating environments do not allow the luxury of assuming events beyond the scope of the program plan are either unlikely to happen, or if they do, will result in only minimal inconvenience. As recent catastrophic events associated with large public projects have shown—ceiling panel collapses in the Boston Big Dig tunnel, levee breaches in New Orleans—events beyond the direct control of the designer and contractor can greatly affect not only the successful implementation of the overall infrastructure program, but adversely impact professional reputations and raise questions of institutional bias and complacency. Such externally generated risks may be realized due to errors by an intermediate supplier, perhaps a subcontractor’s subcontractor, or lack of action or oversight by a customer or governmental representative, indirect risks that are easily overlooked when planning and executing in a complex, multifaceted environment.
    • Download: (458.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Objectively Assessing Risk in a Complex World

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/55477
    Collections
    • Leadership and Management in Engineering

    Show full item record

    contributor authorJan Lyons
    date accessioned2017-05-08T21:32:32Z
    date available2017-05-08T21:32:32Z
    date copyrightOctober 2008
    date issued2008
    identifier other%28asce%291532-6748%282008%298%3A4%28231%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55477
    description abstractWhen engineers think of risk management, it’s often in the context of events directly related to specific program elements—adequately addressing all design criteria, identifying and securing commitments for the necessary program resources, or executing the program plan within budget and schedule constraints. While risks specific to the engineering effort must be addressed and managed to support a successful program outcome, our increasingly complex and interdependent operating environments do not allow the luxury of assuming events beyond the scope of the program plan are either unlikely to happen, or if they do, will result in only minimal inconvenience. As recent catastrophic events associated with large public projects have shown—ceiling panel collapses in the Boston Big Dig tunnel, levee breaches in New Orleans—events beyond the direct control of the designer and contractor can greatly affect not only the successful implementation of the overall infrastructure program, but adversely impact professional reputations and raise questions of institutional bias and complacency. Such externally generated risks may be realized due to errors by an intermediate supplier, perhaps a subcontractor’s subcontractor, or lack of action or oversight by a customer or governmental representative, indirect risks that are easily overlooked when planning and executing in a complex, multifaceted environment.
    publisherAmerican Society of Civil Engineers
    titleObjectively Assessing Risk in a Complex World
    typeJournal Paper
    journal volume8
    journal issue4
    journal titleLeadership and Management in Engineering
    identifier doi10.1061/(ASCE)1532-6748(2008)8:4(231)
    treeLeadership and Management in Engineering:;2008:;Volume ( 008 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian