YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Cost‐ and Schedule‐Control Integration: Issues and Needs

    Source: Journal of Construction Engineering and Management:;1991:;Volume ( 117 ):;issue: 003
    Author:
    William J. Rasdorf
    ,
    Osama Y. Abudayyeh
    DOI: 10.1061/(ASCE)0733-9364(1991)117:3(486)
    Publisher: American Society of Civil Engineers
    Abstract: Cost control and schedule control are two of the most important management functions in the construction industry. Major research efforts are focused on developing procedures for improving the effectiveness of cost and schedule control. As a result, researchers are concerned with the quality, integrity, and timeliness of data that flow through such control systems. A number of data models have been proposed to integrate cost‐ and schedule‐control functions, because such integration is viewed as the, solution to the many problems facing construction projects today. This paper provides an overview of cost‐ and schedule‐control functions, defines the desired control cycle, and discusses the problems and needs of cost‐ and schedule‐control functions. A number of integrated cost‐ and schedule‐control data models, which represent the state of construction research in this area, are discussed. The work‐packaging model is briefly described and is suggested as the most likely existing model to achieve the desired cost and schedule integration. Finally, the conceptual design of a foundational data model for control, based on relational concepts, is provided. The recommended design adopts the conceptual structures of the work‐packaging model.
    • Download: (1.367Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Cost‐ and Schedule‐Control Integration: Issues and Needs

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/54286
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWilliam J. Rasdorf
    contributor authorOsama Y. Abudayyeh
    date accessioned2017-05-08T21:30:43Z
    date available2017-05-08T21:30:43Z
    date copyrightSeptember 1991
    date issued1991
    identifier other%28asce%290733-9364%281991%29117%3A3%28486%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/54286
    description abstractCost control and schedule control are two of the most important management functions in the construction industry. Major research efforts are focused on developing procedures for improving the effectiveness of cost and schedule control. As a result, researchers are concerned with the quality, integrity, and timeliness of data that flow through such control systems. A number of data models have been proposed to integrate cost‐ and schedule‐control functions, because such integration is viewed as the, solution to the many problems facing construction projects today. This paper provides an overview of cost‐ and schedule‐control functions, defines the desired control cycle, and discusses the problems and needs of cost‐ and schedule‐control functions. A number of integrated cost‐ and schedule‐control data models, which represent the state of construction research in this area, are discussed. The work‐packaging model is briefly described and is suggested as the most likely existing model to achieve the desired cost and schedule integration. Finally, the conceptual design of a foundational data model for control, based on relational concepts, is provided. The recommended design adopts the conceptual structures of the work‐packaging model.
    publisherAmerican Society of Civil Engineers
    titleCost‐ and Schedule‐Control Integration: Issues and Needs
    typeJournal Paper
    journal volume117
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1991)117:3(486)
    treeJournal of Construction Engineering and Management:;1991:;Volume ( 117 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian