YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Remediation of a TCE Plume Using a Three-Component Strategy

    Source: Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;2006:;Volume ( 010 ):;issue: 002
    Author:
    Dana L. Dettmers
    ,
    Tamzen W. Macbeth
    ,
    Kent S. Sorenson Jr.
    ,
    Lee O. Nelson
    ,
    Kevin L. Harris
    ,
    Lance N. Peterson
    ,
    Gary D. Mecham
    ,
    Joe S. Rothermel
    DOI: 10.1061/(ASCE)1090-025X(2006)10:2(116)
    Publisher: American Society of Civil Engineers
    Abstract: A residual source of trichloroethene (TCE) contamination in a deep, fractured basalt aquifer at the Idaho National Laboratory was generated by direct injection of chlorinated solvent-containing liquid waste and sanitary sewage resulting in an approximately 3-km-long trichloroethene groundwater plume. Due to the size, location, and characteristics of the contaminated area, a three-component remedy was implemented: (1) in situ bioremediation for restoration of the residual source area; (2) pump and treat for containment and treatment of the medial zone; and (3) monitored natural attenuation for restoration of the distal zone of the plume. Ultimately, the in situ bioremediation and pump and treat components will transition into one final remedy, monitored natural attenuation, for the entire plume. This article summarizes the technical basis and development of each component and describes how integration of three components has achieved a more cost-effective and efficient strategy for remediation of the plume within the remedial time frame.
    • Download: (693.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Remediation of a TCE Plume Using a Three-Component Strategy

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/53828
    Collections
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management

    Show full item record

    contributor authorDana L. Dettmers
    contributor authorTamzen W. Macbeth
    contributor authorKent S. Sorenson Jr.
    contributor authorLee O. Nelson
    contributor authorKevin L. Harris
    contributor authorLance N. Peterson
    contributor authorGary D. Mecham
    contributor authorJoe S. Rothermel
    date accessioned2017-05-08T21:30:01Z
    date available2017-05-08T21:30:01Z
    date copyrightApril 2006
    date issued2006
    identifier other%28asce%291090-025x%282006%2910%3A2%28116%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/53828
    description abstractA residual source of trichloroethene (TCE) contamination in a deep, fractured basalt aquifer at the Idaho National Laboratory was generated by direct injection of chlorinated solvent-containing liquid waste and sanitary sewage resulting in an approximately 3-km-long trichloroethene groundwater plume. Due to the size, location, and characteristics of the contaminated area, a three-component remedy was implemented: (1) in situ bioremediation for restoration of the residual source area; (2) pump and treat for containment and treatment of the medial zone; and (3) monitored natural attenuation for restoration of the distal zone of the plume. Ultimately, the in situ bioremediation and pump and treat components will transition into one final remedy, monitored natural attenuation, for the entire plume. This article summarizes the technical basis and development of each component and describes how integration of three components has achieved a more cost-effective and efficient strategy for remediation of the plume within the remedial time frame.
    publisherAmerican Society of Civil Engineers
    titleRemediation of a TCE Plume Using a Three-Component Strategy
    typeJournal Paper
    journal volume10
    journal issue2
    journal titlePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    identifier doi10.1061/(ASCE)1090-025X(2006)10:2(116)
    treePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;2006:;Volume ( 010 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian