YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    •   YE&T Library
    • ASCE
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Brownfield Redevelopment of Koppers Seaboard Site in Kearny, New Jersey

    Source: Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;1999:;Volume ( 003 ):;issue: 002
    Author:
    Michael L. Hornsby
    ,
    Peter W. Sawchuck
    DOI: 10.1061/(ASCE)1090-025X(1999)3:2(88)
    Publisher: American Society of Civil Engineers
    Abstract: This paper describes the ongoing remediation and brownfield redevelopment project at the former Koppers Seaboard Site in Kearny, New Jersey. The remediation/redevelopment of the 687,990 square meter site, utilizing processed dredged materials (PDM) and pending redevelopment, will help allow vital regional shipping to continue, and renders the site suitable for industrial use. The site was the location of the Koppers Seaboard Coke and By-Products plant, which was razed in 1979. Significant contamination remains from past operations, which included coke production, gas conditioning, and coal-tar refining. A Remedial Action Work Plan (RAWP) was approved by the New Jersey Department of Environmental Protection in 1998. The RAWP proposed to contain contaminants on-site, using a barrier system along the Hackensack River, and capping of the site using PDM. PDM placement was initiated in late 1997 under an interim state approval, and will require approximately three years to complete placement operations. The PDM is manufactured, offsite, by stabilizing dredged materials with Portland Cement and other admixtures. The final thickness of the PDM cap will be about ten m, providing a total storage capacity of about 3,440,000 m
    • Download: (116.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Brownfield Redevelopment of Koppers Seaboard Site in Kearny, New Jersey

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/53594
    Collections
    • Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management

    Show full item record

    contributor authorMichael L. Hornsby
    contributor authorPeter W. Sawchuck
    date accessioned2017-05-08T21:29:39Z
    date available2017-05-08T21:29:39Z
    date copyrightApril 1999
    date issued1999
    identifier other%28asce%291090-025x%281999%293%3A2%2888%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/53594
    description abstractThis paper describes the ongoing remediation and brownfield redevelopment project at the former Koppers Seaboard Site in Kearny, New Jersey. The remediation/redevelopment of the 687,990 square meter site, utilizing processed dredged materials (PDM) and pending redevelopment, will help allow vital regional shipping to continue, and renders the site suitable for industrial use. The site was the location of the Koppers Seaboard Coke and By-Products plant, which was razed in 1979. Significant contamination remains from past operations, which included coke production, gas conditioning, and coal-tar refining. A Remedial Action Work Plan (RAWP) was approved by the New Jersey Department of Environmental Protection in 1998. The RAWP proposed to contain contaminants on-site, using a barrier system along the Hackensack River, and capping of the site using PDM. PDM placement was initiated in late 1997 under an interim state approval, and will require approximately three years to complete placement operations. The PDM is manufactured, offsite, by stabilizing dredged materials with Portland Cement and other admixtures. The final thickness of the PDM cap will be about ten m, providing a total storage capacity of about 3,440,000 m
    publisherAmerican Society of Civil Engineers
    titleBrownfield Redevelopment of Koppers Seaboard Site in Kearny, New Jersey
    typeJournal Paper
    journal volume3
    journal issue2
    journal titlePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management
    identifier doi10.1061/(ASCE)1090-025X(1999)3:2(88)
    treePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;1999:;Volume ( 003 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian