| contributor author | Hilda Lafebre | |
| contributor author | Olu Songonuga | |
| contributor author | Ajay Kathuria | |
| date accessioned | 2017-05-08T21:29:37Z | |
| date available | 2017-05-08T21:29:37Z | |
| date copyright | July 1998 | |
| date issued | 1998 | |
| identifier other | %28asce%291090-025x%281998%292%3A3%28115%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/53564 | |
| description abstract | New Jersey Transit (NJT) is constructing a 34-km-long, dual-track Hudson-Bergen Light Rail Transit System (H-BLRTS) along the Hudson River water front in New Jersey to ease local traffic congestion and to improve the region's economy through restoration of contaminated and abandoned sites. The proposed development includes the construction of various passenger stations and park-and-ride facilities. Among many environmental issues that posed challenges during the planning and construction of the project were the appropriate remedial alternatives for the management of contaminated soil and ground water. A soil reuse plan (SRP) was proposed under which low-to-moderate level contaminated soil excavated during construction was reused on site under paved areas and engineered structures where they would pose no risk to the public. The SRP has been successfully implemented at one of the proposed park-and-ride facilities, known as the Gateway Transit Hub, located within the H-BLRTS, in Jersey City, New Jersey. | |
| publisher | American Society of Civil Engineers | |
| title | Contaminated Soil Management at Construction Sites | |
| type | Journal Paper | |
| journal volume | 2 | |
| journal issue | 3 | |
| journal title | Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management | |
| identifier doi | 10.1061/(ASCE)1090-025X(1998)2:3(115) | |
| tree | Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;1998:;Volume ( 002 ):;issue: 003 | |
| contenttype | Fulltext | |