contributor authorB. W. Chavel
contributor authorC. J. Earls
date accessioned2017-05-08T21:25:27Z
date available2017-05-08T21:25:27Z
date copyrightJanuary 2006
date issued2006
identifier other%28asce%291084-0702%282006%2911%3A1%2881%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/50898
description abstractIn the case of horizontally curved steel I-girder bridges, girder and cross-frame members are frequently detailed for erection in the no-load condition as a matter of convention. As a result, it is imperative that the erection sequence used to construct such bridges be comprehensively studied to ensure that the no-load condition can be achieved in the field and that significant superstructure component fit-up problems do not occur. The current research investigates the erection of a recently constructed horizontally curved steel I-girder bridge, in which significant difficulties were encountered during erection. The bridge erection is recreated through an analytical simulation using a detailed nonlinear finite element model. The analytical results demonstrate that a condition that closely resembles the no-load condition can be achieved in the field during construction with the proper implementation of temporary support structures; and that the difficulties encountered during the erection of the subject bridge superstructure could not be attributed to the erection scheme followed.
publisherAmerican Society of Civil Engineers
titleConstruction of a Horizontally Curved Steel I-Girder Bridge. Part I: Erection Sequence
typeJournal Paper
journal volume11
journal issue1
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)1084-0702(2006)11:1(81)
treeJournal of Bridge Engineering:;2006:;Volume ( 011 ):;issue: 001