description abstractA study of the design/build and non-design/build project delivery experiences of one construction company was conducted to measure the advantages and disadvantages of both delivery methods. How the design/build project delivery method affected contractor employee satisfaction was investigated. The focus of the study was field-level discernment rather than overall corporate management perceptions. An employee survey targeted the contractor's field-level management and consisted of seven open-ended questions. The respondents were consistently optimistic about design/build practices within the company. This study provides contractors with valuable knowledge of the advantages and disadvantages of design/build and non-design/build project delivery methods.
publisherAmerican Society of Civil Engineers
titleField-Level Management's Perspective of Design/Build
typeJournal Paper
journal volume3
journal issue4
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)1084-0680(1998)3:4(180)
treePractice Periodical on Structural Design and Construction:;1998:;Volume ( 003 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record