YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Postoccupancy Indoor Environmental Quality Evaluation of an Institutional Building

    Source: Journal of Architectural Engineering:;1996:;Volume ( 002 ):;issue: 003
    Author:
    Brian A. Rock
    ,
    Craig A. Hillman
    DOI: 10.1061/(ASCE)1076-0431(1996)2:3(88)
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents a case study of an institutional building's heating, ventilation, and air-conditioning (HVAC) system that was not providing satisfactory comfort control. In the investigation, significant design, construction, and operational problems were discovered. Poor communication between the architect, consulting engineers, construction personnel, and owner/financier was a significant factor in the failure of the comfort control system. Problems with the windows, insulation, design of the system zones, supply air fan, and indoor air quality due to poor ventilation were also identified and investigated. Recommendations for correction of these problems range from obvious, low-cost actions to more substantial retrofits of the HVAC system. Actions that should have been taken during the design stages of the project, as well as postoccupancy corrective measures, are discussed with emphasis on comfort, health, and economics. The results of this project show that a well-designed HVAC system will operate poorly if the building is not constructed or operated as planned. This case study should help institutional building contractors, owners, and operators avoid or identify and correct similar problems with their planned and existing comfort control systems. To ensure successful operation of their designs, HVAC designers need feedback from the architect, contractors, building owners, and occupants.
    • Download: (882.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Postoccupancy Indoor Environmental Quality Evaluation of an Institutional Building

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/48491
    Collections
    • Journal of Architectural Engineering

    Show full item record

    contributor authorBrian A. Rock
    contributor authorCraig A. Hillman
    date accessioned2017-05-08T21:21:47Z
    date available2017-05-08T21:21:47Z
    date copyrightSeptember 1996
    date issued1996
    identifier other%28asce%291076-0431%281996%292%3A3%2888%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48491
    description abstractThis paper presents a case study of an institutional building's heating, ventilation, and air-conditioning (HVAC) system that was not providing satisfactory comfort control. In the investigation, significant design, construction, and operational problems were discovered. Poor communication between the architect, consulting engineers, construction personnel, and owner/financier was a significant factor in the failure of the comfort control system. Problems with the windows, insulation, design of the system zones, supply air fan, and indoor air quality due to poor ventilation were also identified and investigated. Recommendations for correction of these problems range from obvious, low-cost actions to more substantial retrofits of the HVAC system. Actions that should have been taken during the design stages of the project, as well as postoccupancy corrective measures, are discussed with emphasis on comfort, health, and economics. The results of this project show that a well-designed HVAC system will operate poorly if the building is not constructed or operated as planned. This case study should help institutional building contractors, owners, and operators avoid or identify and correct similar problems with their planned and existing comfort control systems. To ensure successful operation of their designs, HVAC designers need feedback from the architect, contractors, building owners, and occupants.
    publisherAmerican Society of Civil Engineers
    titlePostoccupancy Indoor Environmental Quality Evaluation of an Institutional Building
    typeJournal Paper
    journal volume2
    journal issue3
    journal titleJournal of Architectural Engineering
    identifier doi10.1061/(ASCE)1076-0431(1996)2:3(88)
    treeJournal of Architectural Engineering:;1996:;Volume ( 002 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian