YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Indoor Air Quality Cost Comparisons in Three Typical Buildings

    Source: Journal of Architectural Engineering:;1996:;Volume ( 002 ):;issue: 003
    Author:
    Peter Rojeski, Jr.
    ,
    Harmohindar Singh
    DOI: 10.1061/(ASCE)1076-0431(1996)2:3(107)
    Publisher: American Society of Civil Engineers
    Abstract: The options of increased ventilation and/or increased filtration to improve indoor air quality in existing buildings were compared. Three buildings, located in Greensboro, N.C., were studied in order to predict the construction, retrofit, and operating costs associated with each option. The analyses included reviews of the building design drawings; site visits and inspections of the heating, ventilating, and air-conditioning systems; review of construction costs; and review of annual utility bills. Retrofit costs were estimated based on supplier quotations for equipment and construction labor estimating guides. Increases in annual maintenance costs were based on the replacement costs of filters plus 5 of the cost of all additional equipment installed. Changes in energy costs were projected using the ASEAM computer simulation program. For each building, the outdoor air was increased from its current operating amount to 100 outdoor air. Similarly, particulate and gas-phase filtration was incrementally increased to filter efficiencies of 95. The retrofit and operating costs and the estimated reduction in indoor air contamination levels were projected. A final costs comparison of alternatives was computed based on a system performance that would reduce indoor air contamination by 80. As expected, meeting the performance target was most costly for the building with split system heat pumps. The building with rooftop units, economizer cycle capability, and a central exhaust system was less expensive. The building with the chilled water system and air handling units with economizer cycles was least expensive. This last building, however, had the highest initial construction cost.
    • Download: (974.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Indoor Air Quality Cost Comparisons in Three Typical Buildings

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/48483
    Collections
    • Journal of Architectural Engineering

    Show full item record

    contributor authorPeter Rojeski, Jr.
    contributor authorHarmohindar Singh
    date accessioned2017-05-08T21:21:46Z
    date available2017-05-08T21:21:46Z
    date copyrightSeptember 1996
    date issued1996
    identifier other%28asce%291076-0431%281996%292%3A3%28107%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48483
    description abstractThe options of increased ventilation and/or increased filtration to improve indoor air quality in existing buildings were compared. Three buildings, located in Greensboro, N.C., were studied in order to predict the construction, retrofit, and operating costs associated with each option. The analyses included reviews of the building design drawings; site visits and inspections of the heating, ventilating, and air-conditioning systems; review of construction costs; and review of annual utility bills. Retrofit costs were estimated based on supplier quotations for equipment and construction labor estimating guides. Increases in annual maintenance costs were based on the replacement costs of filters plus 5 of the cost of all additional equipment installed. Changes in energy costs were projected using the ASEAM computer simulation program. For each building, the outdoor air was increased from its current operating amount to 100 outdoor air. Similarly, particulate and gas-phase filtration was incrementally increased to filter efficiencies of 95. The retrofit and operating costs and the estimated reduction in indoor air contamination levels were projected. A final costs comparison of alternatives was computed based on a system performance that would reduce indoor air contamination by 80. As expected, meeting the performance target was most costly for the building with split system heat pumps. The building with rooftop units, economizer cycle capability, and a central exhaust system was less expensive. The building with the chilled water system and air handling units with economizer cycles was least expensive. This last building, however, had the highest initial construction cost.
    publisherAmerican Society of Civil Engineers
    titleIndoor Air Quality Cost Comparisons in Three Typical Buildings
    typeJournal Paper
    journal volume2
    journal issue3
    journal titleJournal of Architectural Engineering
    identifier doi10.1061/(ASCE)1076-0431(1996)2:3(107)
    treeJournal of Architectural Engineering:;1996:;Volume ( 002 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian