YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Improving Constructability during Design Phase

    Source: Journal of Architectural Engineering:;1995:;Volume ( 001 ):;issue: 002
    Author:
    Thomas E. Glavinich
    DOI: 10.1061/(ASCE)1076-0431(1995)1:2(73)
    Publisher: American Society of Civil Engineers
    Abstract: The timely execution of a construction project is very important to the owner, who makes commitments and plans based on the project's anticipated completion data. Failure of a design professional to consider how the design will be implemented by a builder can result in scheduling problems and delays during the construction process. The purpose of this paper is to increase the awareness of architects and engineers as to the impact that a design's constructability has on a project's construction schedule and cost as well as to other possible consequences for the owner. This paper also discusses strategies that architects and engineers can use to improve constructability and minimize design-related problems during the construction process.
    • Download: (456.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Improving Constructability during Design Phase

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/48436
    Collections
    • Journal of Architectural Engineering

    Show full item record

    contributor authorThomas E. Glavinich
    date accessioned2017-05-08T21:21:41Z
    date available2017-05-08T21:21:41Z
    date copyrightJune 1995
    date issued1995
    identifier other%28asce%291076-0431%281995%291%3A2%2873%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48436
    description abstractThe timely execution of a construction project is very important to the owner, who makes commitments and plans based on the project's anticipated completion data. Failure of a design professional to consider how the design will be implemented by a builder can result in scheduling problems and delays during the construction process. The purpose of this paper is to increase the awareness of architects and engineers as to the impact that a design's constructability has on a project's construction schedule and cost as well as to other possible consequences for the owner. This paper also discusses strategies that architects and engineers can use to improve constructability and minimize design-related problems during the construction process.
    publisherAmerican Society of Civil Engineers
    titleImproving Constructability during Design Phase
    typeJournal Paper
    journal volume1
    journal issue2
    journal titleJournal of Architectural Engineering
    identifier doi10.1061/(ASCE)1076-0431(1995)1:2(73)
    treeJournal of Architectural Engineering:;1995:;Volume ( 001 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian