YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Expected Performance of Pavement Repair Works in a Global Network Optimization Model

    Source: Journal of Infrastructure Systems:;2007:;Volume ( 013 ):;issue: 002
    Author:
    Khaled A. Abaza
    DOI: 10.1061/(ASCE)1076-0342(2007)13:2(124)
    Publisher: American Society of Civil Engineers
    Abstract: A global network optimization model has been developed for generating a pavement repair plan using expected performance of pavement repair works. The expected performance of pavement repair works is represented by the expected age (service life) associated with potential repair actions. The expected age defines the anticipated pavement condition improvement obtained from applying a particular repair action. The expected age for each repair action is usually known from either experience or assumed as part of a design procedure. A constrained linear optimization model is formulated with its main objective of optimizing the expected pavement condition improvement. Pavement condition improvement is defined as the age gain in year lane kilometer or average age in years extended to a pavement network as a result of applying potential repair actions. The global linear model is subjected to a single budget constraint enforcing the total budget available for the entire network and limitation constraints placing lower and upper limits on the repair variables. The optimum repair plan provides a macroscopic solution as the repair variables represent pavement proportions that should be treated by the corresponding repair actions. The pavement network is divided into a number of systems with similar pavement structures and loading conditions. Presented sample results have indicated that global network optimization of the pavement management problem may not result in a rational budget allocation among deployed pavement systems. This problem can be solved by enforcing system improvement requirement constraints.
    • Download: (133.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Expected Performance of Pavement Repair Works in a Global Network Optimization Model

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/48292
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorKhaled A. Abaza
    date accessioned2017-05-08T21:21:28Z
    date available2017-05-08T21:21:28Z
    date copyrightJune 2007
    date issued2007
    identifier other%28asce%291076-0342%282007%2913%3A2%28124%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48292
    description abstractA global network optimization model has been developed for generating a pavement repair plan using expected performance of pavement repair works. The expected performance of pavement repair works is represented by the expected age (service life) associated with potential repair actions. The expected age defines the anticipated pavement condition improvement obtained from applying a particular repair action. The expected age for each repair action is usually known from either experience or assumed as part of a design procedure. A constrained linear optimization model is formulated with its main objective of optimizing the expected pavement condition improvement. Pavement condition improvement is defined as the age gain in year lane kilometer or average age in years extended to a pavement network as a result of applying potential repair actions. The global linear model is subjected to a single budget constraint enforcing the total budget available for the entire network and limitation constraints placing lower and upper limits on the repair variables. The optimum repair plan provides a macroscopic solution as the repair variables represent pavement proportions that should be treated by the corresponding repair actions. The pavement network is divided into a number of systems with similar pavement structures and loading conditions. Presented sample results have indicated that global network optimization of the pavement management problem may not result in a rational budget allocation among deployed pavement systems. This problem can be solved by enforcing system improvement requirement constraints.
    publisherAmerican Society of Civil Engineers
    titleExpected Performance of Pavement Repair Works in a Global Network Optimization Model
    typeJournal Paper
    journal volume13
    journal issue2
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)1076-0342(2007)13:2(124)
    treeJournal of Infrastructure Systems:;2007:;Volume ( 013 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian