YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimal Scheduling of Replacement and Rehabilitation of Water Distribution Systems

    Source: Journal of Infrastructure Systems:;2006:;Volume ( 012 ):;issue: 003
    Author:
    H. P. Hong
    ,
    E. N. Allouche
    ,
    M. Trivedi
    DOI: 10.1061/(ASCE)1076-0342(2006)12:3(184)
    Publisher: American Society of Civil Engineers
    Abstract: Many municipal water distribution systems across North America are reaching or have exceeded their design lives and, therefore, require extensive upgrading through rehabilitation and/or replacement. However, these needs far surpass the available resources, and decision makers must prioritize their replacement/rehabilitation needs. One such approach is the determination of the optimal replacement time based on the minimization of the total or annual average cost during a predetermined service period. This paper describes a simple approach for the optimization of replacement/rehabilitation activities for a network of buried pipes, which is based on the assumption that the occurrence of breaks in a pipeline segment follows a nonhomogeneous Poisson process. Equations for evaluating the optimal replacement time are derived by minimizing the expected annual average cost during the service period of the pipeline segment. Predictions are compared with those obtained by minimizing the expected total (accumulated) cost during the service or planning period. The use of the proposed approach is illustrated via numerical examples. Optimal replacement time predictions, based on minimization of the annual average cost, were found to be significantly longer than those obtained based on minimization of the total cost for the case—where break occurrence rate follows an exponential function.
    • Download: (158.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Optimal Scheduling of Replacement and Rehabilitation of Water Distribution Systems

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/48269
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorH. P. Hong
    contributor authorE. N. Allouche
    contributor authorM. Trivedi
    date accessioned2017-05-08T21:21:27Z
    date available2017-05-08T21:21:27Z
    date copyrightSeptember 2006
    date issued2006
    identifier other%28asce%291076-0342%282006%2912%3A3%28184%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48269
    description abstractMany municipal water distribution systems across North America are reaching or have exceeded their design lives and, therefore, require extensive upgrading through rehabilitation and/or replacement. However, these needs far surpass the available resources, and decision makers must prioritize their replacement/rehabilitation needs. One such approach is the determination of the optimal replacement time based on the minimization of the total or annual average cost during a predetermined service period. This paper describes a simple approach for the optimization of replacement/rehabilitation activities for a network of buried pipes, which is based on the assumption that the occurrence of breaks in a pipeline segment follows a nonhomogeneous Poisson process. Equations for evaluating the optimal replacement time are derived by minimizing the expected annual average cost during the service period of the pipeline segment. Predictions are compared with those obtained by minimizing the expected total (accumulated) cost during the service or planning period. The use of the proposed approach is illustrated via numerical examples. Optimal replacement time predictions, based on minimization of the annual average cost, were found to be significantly longer than those obtained based on minimization of the total cost for the case—where break occurrence rate follows an exponential function.
    publisherAmerican Society of Civil Engineers
    titleOptimal Scheduling of Replacement and Rehabilitation of Water Distribution Systems
    typeJournal Paper
    journal volume12
    journal issue3
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)1076-0342(2006)12:3(184)
    treeJournal of Infrastructure Systems:;2006:;Volume ( 012 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian