| contributor author | Kelvin C. Wang | |
| contributor author | Weiguo Gong | |
| date accessioned | 2017-05-08T21:21:24Z | |
| date available | 2017-05-08T21:21:24Z | |
| date copyright | September 2005 | |
| date issued | 2005 | |
| identifier other | %28asce%291076-0342%282005%2911%3A3%28154%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/48233 | |
| description abstract | As a part of the digital highway data vehicle (DHDV), the automated survey system developed at the University of Arkansas is the implementation of a real-time system for pavement surface cracking survey. The researchers faced tremendous tasks in optimizing imaging algorithms to speed up the processing at the same time without sacrificing accuracy in identifying and classifying cracks. This paper introduces the automated real-time system and summarizes the experiences in developing parallel algorithms in imaging processing used in the real-time system. The hardware system for processing images is based on the ubiquitous multiple Central Processing Unit (CPU) | |
| publisher | American Society of Civil Engineers | |
| title | Real-Time Automated Survey System of Pavement Cracking in Parallel Environment | |
| type | Journal Paper | |
| journal volume | 11 | |
| journal issue | 3 | |
| journal title | Journal of Infrastructure Systems | |
| identifier doi | 10.1061/(ASCE)1076-0342(2005)11:3(154) | |
| tree | Journal of Infrastructure Systems:;2005:;Volume ( 011 ):;issue: 003 | |
| contenttype | Fulltext | |