YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Too Cautious? Avoiding Risk in Transportation Project Development

    Source: Journal of Infrastructure Systems:;2002:;Volume ( 008 ):;issue: 001
    Author:
    Harry Hecht
    ,
    Debbie Niemeier
    DOI: 10.1061/(ASCE)1076-0342(2002)8:1(20)
    Publisher: American Society of Civil Engineers
    Abstract: The general public perception is that it takes too long and costs too much to get new capacity enhancing transportation projects constructed. In California, previous audits of the California Transportation Department (Caltrans) have consistently identified transportation project development time and cost as overly long and too expensive, where project development includes conducting preliminary engineering, preparing environmental studies, completing final design, and acquiring the necessary permits. These audits have also suggested that the individual project manager greatly influenced project development success, as measured by time and cost. Several of the audits concluded that project managers were simply too cautious in making some of the engineering decisions associated with project development, and this risk-averse behavior was a major factor contributing to inefficient project development. This research explores the relationship between risk averse behavior (i.e., engineering judgment applied to certain types of situational problems) and transportation project development time/cost. We find that risk-averse behavior by project managers does not significantly affect project development time or cost. We further conclude, based on project manager feedback, that the required project development process is simply too rigid and bureaucratic to allow an individual project manager to significantly reduce the time or cost of project development.
    • Download: (470.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Too Cautious? Avoiding Risk in Transportation Project Development

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/48154
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorHarry Hecht
    contributor authorDebbie Niemeier
    date accessioned2017-05-08T21:21:15Z
    date available2017-05-08T21:21:15Z
    date copyrightMarch 2002
    date issued2002
    identifier other%28asce%291076-0342%282002%298%3A1%2820%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48154
    description abstractThe general public perception is that it takes too long and costs too much to get new capacity enhancing transportation projects constructed. In California, previous audits of the California Transportation Department (Caltrans) have consistently identified transportation project development time and cost as overly long and too expensive, where project development includes conducting preliminary engineering, preparing environmental studies, completing final design, and acquiring the necessary permits. These audits have also suggested that the individual project manager greatly influenced project development success, as measured by time and cost. Several of the audits concluded that project managers were simply too cautious in making some of the engineering decisions associated with project development, and this risk-averse behavior was a major factor contributing to inefficient project development. This research explores the relationship between risk averse behavior (i.e., engineering judgment applied to certain types of situational problems) and transportation project development time/cost. We find that risk-averse behavior by project managers does not significantly affect project development time or cost. We further conclude, based on project manager feedback, that the required project development process is simply too rigid and bureaucratic to allow an individual project manager to significantly reduce the time or cost of project development.
    publisherAmerican Society of Civil Engineers
    titleToo Cautious? Avoiding Risk in Transportation Project Development
    typeJournal Paper
    journal volume8
    journal issue1
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)1076-0342(2002)8:1(20)
    treeJournal of Infrastructure Systems:;2002:;Volume ( 008 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian