YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Reconciliation of Owner and Contractor Views in Heavy Construction Projects

    Source: Journal of Professional Issues in Engineering Education and Practice:;2008:;Volume ( 134 ):;issue: 001
    Author:
    Engy Serag
    ,
    Amr Oloufa
    ,
    Linda Malone
    DOI: 10.1061/(ASCE)1052-3928(2008)134:1(128)
    Publisher: American Society of Civil Engineers
    Abstract: Delay and loss of productivity are the two main types of damage experienced by the contractor when the owner issues a change order. Courts have recognized critical path method schedule analysis as the preferred method of identifying and quantifying critical delays. As for the inefficiency damages, there is no direct way of measuring inefficiency due to its qualitative nature and the difficulty of linking the cause of the productivity loss to the damage. Most of the scholarly work published in this area was based on data supplied by the contractors; and that explains why there are discrepancies between what the contractor asks for and what the owner believes the contractor is entitled to. This study addresses the need for a statistical model to quantify the productivity loss from verifiable site data such as owner’s daily reports, change orders, drawings, and specifications, rather than rely solely on contractor surveys. A model is developed and validated to quantify the productivity loss in pipe work in roadway projects due to the change orders. The productivity loss study analyzed two sets of data that include: (1) variables that predict which of the two parties, the owner and the contractor, contributed to the productivity loss; and (2) variables that predict, from the legal viewpoint, productivity losses which only the owner is responsible for. The study showed the difference between what the contractor asked for and what he/she is actually entitled to. This model can be used by both the owner and the contractor to quantify the productivity loss due to change orders, and to offer an objective approach to reconcile their differences. This study concludes with an example to demonstrate the use of the model.
    • Download: (462.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Reconciliation of Owner and Contractor Views in Heavy Construction Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/47894
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    Show full item record

    contributor authorEngy Serag
    contributor authorAmr Oloufa
    contributor authorLinda Malone
    date accessioned2017-05-08T21:20:51Z
    date available2017-05-08T21:20:51Z
    date copyrightJanuary 2008
    date issued2008
    identifier other%28asce%291052-3928%282008%29134%3A1%28128%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47894
    description abstractDelay and loss of productivity are the two main types of damage experienced by the contractor when the owner issues a change order. Courts have recognized critical path method schedule analysis as the preferred method of identifying and quantifying critical delays. As for the inefficiency damages, there is no direct way of measuring inefficiency due to its qualitative nature and the difficulty of linking the cause of the productivity loss to the damage. Most of the scholarly work published in this area was based on data supplied by the contractors; and that explains why there are discrepancies between what the contractor asks for and what the owner believes the contractor is entitled to. This study addresses the need for a statistical model to quantify the productivity loss from verifiable site data such as owner’s daily reports, change orders, drawings, and specifications, rather than rely solely on contractor surveys. A model is developed and validated to quantify the productivity loss in pipe work in roadway projects due to the change orders. The productivity loss study analyzed two sets of data that include: (1) variables that predict which of the two parties, the owner and the contractor, contributed to the productivity loss; and (2) variables that predict, from the legal viewpoint, productivity losses which only the owner is responsible for. The study showed the difference between what the contractor asked for and what he/she is actually entitled to. This model can be used by both the owner and the contractor to quantify the productivity loss due to change orders, and to offer an objective approach to reconcile their differences. This study concludes with an example to demonstrate the use of the model.
    publisherAmerican Society of Civil Engineers
    titleReconciliation of Owner and Contractor Views in Heavy Construction Projects
    typeJournal Paper
    journal volume134
    journal issue1
    journal titleJournal of Professional Issues in Engineering Education and Practice
    identifier doi10.1061/(ASCE)1052-3928(2008)134:1(128)
    treeJournal of Professional Issues in Engineering Education and Practice:;2008:;Volume ( 134 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian