YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Case Study in Engineering History Education: Robert Stephenson’s “Last Great Work”—The Victoria Bridge in Montréal

    Source: Journal of Professional Issues in Engineering Education and Practice:;2005:;Volume ( 131 ):;issue: 001
    Author:
    Alistair MacKenzie
    DOI: 10.1061/(ASCE)1052-3928(2005)131:1(32)
    Publisher: American Society of Civil Engineers
    Abstract: The Victoria Bridge across the St. Lawrence River at Montréal is one of the great engineering achievements of the 19th century. At the time of its construction it was the largest bridge project in the world. It was also the last major project of the last of the “legendary” engineering figures of the “Victorian” era of engineering, Robert Stephenson. There were many doubters as to the ability of the engineers of the day to construct a project of this size given the physical conditions of the site. The story of the construction of the Victoria Bridge is one that combines business imperatives, engineering design skills, and construction ingenuity with the enormous challenges presented by one of the world’s great, fast flowing rivers and with the severity of Canadian winters and the massive “ice shoves” that occur as a result. Following its completion controversy raged as to who deserved the most credit for the conception and design of the bridge. The bridge was constructed between 1854 and 1860 and was formally opened by the Prince of Wales in the summer of 1860. Starting in 1897, the original Tubular Superstructure was replaced by pin-connected through trusses designed to carry two rail tracks with a roadway and sidewalk cantilevered out on each side. The bridge was formally reopened on October 16, 1901 and renamed the “Victoria Jubilee Bridge.” It continues to serve rail and road traffic to the present day.
    • Download: (542.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Case Study in Engineering History Education: Robert Stephenson’s “Last Great Work”—The Victoria Bridge in Montréal

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/47729
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    Show full item record

    contributor authorAlistair MacKenzie
    date accessioned2017-05-08T21:20:36Z
    date available2017-05-08T21:20:36Z
    date copyrightJanuary 2005
    date issued2005
    identifier other%28asce%291052-3928%282005%29131%3A1%2832%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47729
    description abstractThe Victoria Bridge across the St. Lawrence River at Montréal is one of the great engineering achievements of the 19th century. At the time of its construction it was the largest bridge project in the world. It was also the last major project of the last of the “legendary” engineering figures of the “Victorian” era of engineering, Robert Stephenson. There were many doubters as to the ability of the engineers of the day to construct a project of this size given the physical conditions of the site. The story of the construction of the Victoria Bridge is one that combines business imperatives, engineering design skills, and construction ingenuity with the enormous challenges presented by one of the world’s great, fast flowing rivers and with the severity of Canadian winters and the massive “ice shoves” that occur as a result. Following its completion controversy raged as to who deserved the most credit for the conception and design of the bridge. The bridge was constructed between 1854 and 1860 and was formally opened by the Prince of Wales in the summer of 1860. Starting in 1897, the original Tubular Superstructure was replaced by pin-connected through trusses designed to carry two rail tracks with a roadway and sidewalk cantilevered out on each side. The bridge was formally reopened on October 16, 1901 and renamed the “Victoria Jubilee Bridge.” It continues to serve rail and road traffic to the present day.
    publisherAmerican Society of Civil Engineers
    titleCase Study in Engineering History Education: Robert Stephenson’s “Last Great Work”—The Victoria Bridge in Montréal
    typeJournal Paper
    journal volume131
    journal issue1
    journal titleJournal of Professional Issues in Engineering Education and Practice
    identifier doi10.1061/(ASCE)1052-3928(2005)131:1(32)
    treeJournal of Professional Issues in Engineering Education and Practice:;2005:;Volume ( 131 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian